Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina A&T |
---|---|
Assessment Year | 1988 |
Principal Product | UPHOLSTERY & BEDSPREADS |
NAICS | n/a |
SIC | 2211 - Broadwoven Fabric Mills, Cotton |
Sales | $10,000,000-$50,000,000 |
# of Employees | 232 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $226,610 | 3,936,401 | kWh | $0.06 |
Natural Gas | $318,794 | 76,527 | MMBtu | $4.17 |
Fuel Oil #2 | $21,402 | 6,370 | MMBtu | $3.36 |
TOTAL ENERGY COSTS | $566,806 | |||
RECOMMENDED SAVINGS* | $133,665 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $129,468 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Electricity Usage | Natural Gas | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $124,949 Cost: $261,000 |
- | - | $107,249 | 25,719 | $17,700 | 5,268 |
- - kWh |
$107,249 25,719 MMBtu |
$17,700 5,268 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $770 Cost: $130 |
- | - | $659 | 158 | $111 | 33 |
- - kWh |
$659 158 MMBtu |
$111 33 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $281 Cost: $200 |
- | - | $241 | 60 | $40 | 12 |
- - kWh |
$241 60 MMBtu |
$40 12 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,922 Cost: $1,817 |
$2,922 | 50,703 | - | - | - | - |
$2,922 50,703 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $419 Cost: $746 |
$419 | 7,327 | - | - | - | - |
$419 7,327 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $1,829 Cost: - |
$1,829 | 31,653 | - | - | - | - |
$1,829 31,653 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $884 Cost: - |
$884 | 15,240 | - | - | - | - |
$884 15,240 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $336 Cost: $150 |
$336 | 6,155 | - | - | - | - |
$336 6,155 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,275 Cost: $3,000 |
$1,275 | 22,274 | - | - | - | - |
$1,275 22,274 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $133,665 Cost: $267,043 |
$7,665 | 133,352 | $108,149 | 25,937 | $17,851 | 5,313 | $7,665 133,352 kWh |
$108,149 25,937 MMBtu |
$17,851 5,313 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $129,468 Cost: $262,226 |
$3,468 | 60,375 | $108,149 | 25,937 | $17,851 | 5,313 | $3,468 60,375 kWh |
$108,149 25,937 MMBtu |
$17,851 5,313 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Electricity Usage | Natural Gas | Fuel Oil #2 |