IAC Assessment: AT0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1988
Principal Product BREAD AND ROLLS
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 30,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $147,648 2,910,023 kWh $0.05
Natural Gas $104,222 23,150 MMBtu $4.50
TOTAL ENERGY COSTS $251,870
RECOMMENDED SAVINGS* $14,825 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,609
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$5,220
Cost:
$500
- - $5,220 1,160 - - -
-
kWh
$5,220
1,160
MMBtu
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$945
Cost:
$500
$945 18,757 - - - - $945
18,757
kWh
-
-
MMBtu
-
-
$
03: 2.1222 INSTALL TURBULATORS Savings:
$602
Cost:
$700
- - $602 134 - - -
-
kWh
$602
134
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$871
Cost:
$500
- - $1,071 238 $(-200) - -
-
kWh
$1,071
238
MMBtu
$(-200)
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$516
Cost:
$900
$516 10,258 - - - - $516
10,258
kWh
-
-
MMBtu
-
-
$
06: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$2,105
Cost:
$100
- - $2,105 468 - - -
-
kWh
$2,105
468
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$996
Cost:
-
$996 19,637 - - - - $996
19,637
kWh
-
-
MMBtu
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$524
Cost:
$476
$524 10,258 - - - - $524
10,258
kWh
-
-
MMBtu
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,185
Cost:
-
$1,185 23,447 - - - - $1,185
23,447
kWh
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,861
Cost:
$1,315
$1,861 36,635 - - - - $1,861
36,635
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$14,825
Cost:
$4,991
$6,027 118,992 $8,998 2,000 $(-200) - $6,027
118,992
kWh
$8,998
2,000
MMBtu
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
$8,609
Cost:
$4,491
$5,031 99,355 $3,778 840 $(-200) - $5,031
99,355
kWh
$3,778
840
MMBtu
$(-200)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes