IAC Assessment: AT0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1988
Principal Product VALVES FOR AUTO INDUSTRY
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 65,000,000 Pieces
Production Hrs. Annual 4,800
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $472,326 8,228,019 kWh $0.06
Natural Gas $137,293 32,768 MMBtu $4.19
TOTAL ENERGY COSTS $609,619
RECOMMENDED SAVINGS* $64,196 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $61,689
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$47,649
Cost:
$18,500
$2,133 37,222 - - $45,516 - $2,133
37,222
kWh
-
-
MMBtu
$45,516
-
$
02: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$6,328
Cost:
$7,000
$6,328 110,199 - - - - $6,328
110,199
kWh
-
-
MMBtu
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,633
Cost:
$1,297
$1,633 28,429 - - - - $1,633
28,429
kWh
-
-
MMBtu
-
-
$
04: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,683
Cost:
-
$1,683 29,308 - - - - $1,683
29,308
kWh
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,501
Cost:
-
$2,501 43,669 - - - - $2,501
43,669
kWh
-
-
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$367
Cost:
$250
- - $367 91 - - -
-
kWh
$367
91
MMBtu
-
-
$
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,050
Cost:
$600
- - $1,050 260 - - -
-
kWh
$1,050
260
MMBtu
-
-
$
08: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$376
Cost:
-
- - $506 125 $(-130) - -
-
kWh
$506
125
MMBtu
$(-130)
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,785
Cost:
$2,500
$1,785 31,067 - - - - $1,785
31,067
kWh
-
-
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$824
Cost:
$100
$824 14,361 - - - - $824
14,361
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$64,196
Cost:
$30,247
$16,887 294,255 $1,923 476 $45,386 - $16,887
294,255
kWh
$1,923
476
MMBtu
$45,386
-
$
TOTAL IMPLEMENTED Savings:
$61,689
Cost:
$30,147
$14,380 250,586 $1,923 476 $45,386 - $14,380
250,586
kWh
$1,923
476
MMBtu
$45,386
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes