Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina A&T |
---|---|
Assessment Year | 1988 |
Principal Product | MENS AND BOYS SHIRTS |
NAICS | n/a |
SIC | 2321 - Men's and Boys' Shirts, Except Work Shirts |
Sales | $1,000,000-$5,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 480,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $25,508 | 339,977 | kWh | $0.08 |
Natural Gas | $7,795 | 1,589 | MMBtu | $4.91 |
Fuel Oil #2 | $3,269 | 553 | MMBtu | $5.91 |
TOTAL ENERGY COSTS | $36,572 | |||
RECOMMENDED SAVINGS* | $3,374 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,374 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $1,420 Cost: $1,000 |
$1,420 | - | - | - | - | - |
$1,420 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $291 Cost: $202 |
$291 | 3,810 | - | - | - | - |
$291 3,810 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $448 Cost: $200 |
$448 | 5,862 | - | - | - | - |
$448 5,862 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4312 IMPROVE LUBRICATION PRACTICES |
Savings: $369 Cost: - |
$369 | 4,982 | - | - | - | - |
$369 4,982 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $148 Cost: - |
$148 | 2,052 | - | - | - | - |
$148 2,052 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $176 Cost: - |
- | - | $296 | 88 | $(-120) | - |
- - kWh |
$296 88 MMBtu |
$(-120) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1232 KEEP BOILER TUBES CLEAN |
Savings: $397 Cost: $400 |
- | - | $397 | 84 | - | - |
- - kWh |
$397 84 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $125 Cost: $300 |
$125 | 1,758 | - | - | - | - |
$125 1,758 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $3,374 Cost: $2,102 |
$2,801 | 18,464 | $693 | 172 | $(-120) | - | $2,801 18,464 kWh |
$693 172 MMBtu |
$(-120) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,374 Cost: $2,102 |
$2,801 | 18,464 | $693 | 172 | $(-120) | - | $2,801 18,464 kWh |
$693 172 MMBtu |
$(-120) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |