IAC Assessment: AT0109
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0109
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1988
Principal Product MILK AND ICE CREAM
NAICS n/a
SIC 2024 - Ice Cream And Frozen Desserts
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 326,000 Thousand Gallons
Production Hrs. Annual 6,240
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $457,494 8,915,299 kWh $0.05
Natural Gas $87,197 21,585 MMBtu $4.04
Fuel Oil #2 $15,484 4,312 MMBtu $3.59
TOTAL ENERGY COSTS $560,175
RECOMMENDED SAVINGS* $38,813 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,508
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$14,040
Cost:
$5,000
- - $11,986 2,967 $2,054 572 - - -
-
kWh
$11,986
2,967
MMBtu
$2,054
572
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,365
Cost:
-
- - $1,507 373 $258 72 $(-400) - -
-
kWh
$1,507
373
MMBtu
$258
72
MMBtu
$(-400)
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,281
Cost:
$500
- - $1,947 482 $334 93 - - -
-
kWh
$1,947
482
MMBtu
$334
93
MMBtu
-
-
$
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$790
Cost:
$1,700
- - $675 167 $115 32 - - -
-
kWh
$675
167
MMBtu
$115
32
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$322
Cost:
$390
- - $275 68 $47 13 - - -
-
kWh
$275
68
MMBtu
$47
13
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,280
Cost:
$4,181
$12,280 239,449 - - - - - - $12,280
239,449
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,333
Cost:
$829
$1,333 26,084 - - - - - - $1,333
26,084
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,383
Cost:
-
$4,383 85,287 - - - - - - $4,383
85,287
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$837
Cost:
-
$837 16,413 - - - - - - $837
16,413
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,182
Cost:
$1,200
$1,182 23,154 - - - - - - $1,182
23,154
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$38,813
Cost:
$13,800
$20,015 390,387 $16,390 4,057 $2,808 782 $(-400) - $20,015
390,387
kWh
$16,390
4,057
MMBtu
$2,808
782
MMBtu
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
$35,508
Cost:
$10,071
$17,500 341,149 $15,715 3,890 $2,693 750 $(-400) - $17,500
341,149
kWh
$15,715
3,890
MMBtu
$2,693
750
MMBtu
$(-400)
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes Electricity Usage Natural Gas Fuel Oil #2 Administrative Changes