IAC logo
IAC Assessment: AT0121
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0121
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1989
Principal Product FIRE EXTINGUISHERS
NAICS n/a
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 0
Annual Production 12,000,000 Tons
Production Hrs. Annual 6,240
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $347,984 6,395,956 kWh $0.05
Natural Gas $177,256 45,084 MMBtu $3.93
TOTAL ENERGY COSTS $525,240
RECOMMENDED SAVINGS* $84,578 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,516
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$52,560
Cost:
$22,000
- - $52,560 13,374 -
-
kWh
$52,560
13,374
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,502
Cost:
$10,000
- - $5,502 1,400 -
-
kWh
$5,502
1,400
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,153
Cost:
$1,500
$2,153 39,566 - - $2,153
39,566
kWh
-
-
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$13,451
Cost:
$50
- - $13,451 3,423 -
-
kWh
$13,451
3,423
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$837
Cost:
$616
$837 15,533 - - $837
15,533
kWh
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,374
Cost:
$300
$8,374 153,869 - - $8,374
153,869
kWh
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$505
Cost:
$500
$505 9,379 - - $505
9,379
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,196
Cost:
$1,080
$1,196 21,981 - - $1,196
21,981
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$84,578
Cost:
$36,046
$13,065 240,328 $71,513 18,197 $13,065
240,328
kWh
$71,513
18,197
MMBtu
TOTAL IMPLEMENTED Savings:
$26,516
Cost:
$4,046
$13,065 240,328 $13,451 3,423 $13,065
240,328
kWh
$13,451
3,423
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas