Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 1996 |
Principal Product | Stoneware |
NAICS | n/a |
SIC | 3296 - Mineral Wool |
Sales | $10,000,000-$50,000,000 |
# of Employees | 145 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 2,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $97,558 | 2,141,559 | kWh | $0.05 |
Electricity Demand | $59,686 | 6,203 | kW-months/year | $9.62 |
Electricity Fees | $(-5,376) | - | $ | - |
Natural Gas | $279,338 | 94,990 | MMBtu | $2.94 |
TOTAL ENERGY COSTS | $438,886 | |||
RECOMMENDED SAVINGS* | $67,818 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,183 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $30,964 Cost: $19,800 |
- | - | - | - | $30,964 | 10,789 | - | - |
- - kWh |
- - kW-months/year |
$30,964 10,789 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $11,282 Cost: $17,740 |
$9,041 | 224,795 | $2,241 | 233 | - | - | - | - |
$9,041 224,795 kWh |
$2,241 233 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $6,185 Cost: $2,000 |
$6,185 | 153,869 | - | - | - | - | - | - |
$6,185 153,869 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,804 Cost: $1,804 |
$1,446 | 36,049 | $358 | 37 | - | - | - | - |
$1,446 36,049 kWh |
$358 37 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,203 Cost: - |
$1,203 | 29,894 | - | - | - | - | - | - |
$1,203 29,894 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,025 Cost: $500 |
$1,025 | 25,498 | - | - | - | - | - | - |
$1,025 25,498 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $959 Cost: $975 |
$712 | 17,585 | $247 | 26 | - | - | - | - |
$712 17,585 kWh |
$247 26 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $12,484 Cost: $3,600 |
$(-500) | (-12,309) | - | - | - | - | $12,984 | - |
$(-500) (-12,309) kWh |
- - kW-months/year |
- - MMBtu |
$12,984 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4151 MINIMIZE WATER USAGE |
Savings: $1,912 Cost: $1,250 |
- | - | - | - | - | - | $1,912 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,912 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $67,818 Cost: $47,669 |
$19,112 | 475,381 | $2,846 | 296 | $30,964 | 10,789 | $14,896 | - | $19,112 475,381 kWh |
$2,846 296 kW-months/year |
$30,964 10,789 MMBtu |
$14,896 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,183 Cost: $39,290 |
$10,066 | 250,293 | $2,241 | 233 | $30,964 | 10,789 | $1,912 | - | $10,066 250,293 kWh |
$2,241 233 kW-months/year |
$30,964 10,789 MMBtu |
$1,912 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption |