IAC Assessment: BD0085
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0085
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1997
Principal Product Rigid Foam Insulation
NAICS n/a
SIC 3296 - Mineral Wool
Sales $10,000,000-$50,000,000
# of Employees 48
Plant Area (Sq.Ft.) 146,142
Annual Production 145,000 Units
Production Hrs. Annual 4,160
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,094 2,112,544 kWh $0.03
Electricity Demand $53,194 4,608 kW-months/year $11.54
Electricity Fees $6,449 - $ -
Natural Gas $46,480 9,832 MMBtu $4.73
TOTAL ENERGY COSTS $357,039
RECOMMENDED SAVINGS* $30,820 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,319
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,667
Cost:
$6,050
$8,543 321,219 $4,233 396 $(-6,109) (-1,370) - - - - - - - - - - $8,543
321,219
kWh
$4,233
396
kW-months/year
$(-6,109)
(-1,370)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$5,587
Cost:
$1,750
- - - - $5,587 1,253 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,587
1,253
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,828
Cost:
$9,330
$2,066 70,340 $1,762 153 - - - - - - - - - - - - $2,066
70,340
kWh
$1,762
153
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,772
Cost:
$300
$878 29,894 $894 78 - - - - - - - - - - - - $878
29,894
kWh
$894
78
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$517
Cost:
$250
- - - - $517 116 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$517
116
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$745
Cost:
$975
$403 13,775 $342 30 - - - - - - - - - - - - $403
13,775
kWh
$342
30
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$9,491
Cost:
$1,000
$(-8) (-293) - - - - - - $7,452 182,000 $(-2,048) - $4,095 - - - $(-8)
(-293)
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$7,452
182,000
lb
$(-2,048)
-
$
$4,095
-
$
-
-
$
08: 3.4151 MINIMIZE WATER USAGE Savings:
$532
Cost:
$805
- - - - - - $532 101,920 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$532
101,920
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
09: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,681
Cost:
$1,000
- - - - - - - - - - - - - - $1,681 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
$1,681
-
$
TOTAL RECOMMENDED Savings:
$30,820
Cost:
$21,460
$11,882 434,935 $7,231 657 $(-5) (-1) $532 101,920 $7,452 182,000 $(-2,048) - $4,095 - $1,681 - $11,882
434,935
kWh
$7,231
657
kW-months/year
$(-5)
(-1)
MMBtu
$532
101,920
Tgal
$7,452
182,000
lb
$(-2,048)
-
$
$4,095
-
$
$1,681
-
$
TOTAL IMPLEMENTED Savings:
$13,319
Cost:
$10,330
$2,058 70,047 $1,762 153 - - - - $7,452 182,000 $(-2,048) - $4,095 - - - $2,058
70,047
kWh
$1,762
153
kW-months/year
-
-
MMBtu
-
-
Tgal
$7,452
182,000
lb
$(-2,048)
-
$
$4,095
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Primary Product