IAC Assessment: BD0103
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0103
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product Foam Padding
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 45,000
Annual Production 41,308,512 Pounds
Production Hrs. Annual 4,810
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $151,230 3,057,737 kWh $0.05
Electricity Demand $128,654 12,267 kW-months/year $10.49
Electricity Fees $2,267 - $ -
Natural Gas $83,485 51,132 MMBtu $1.63
TOTAL ENERGY COSTS $367,559
RECOMMENDED SAVINGS* $95,119 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,119
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$15,194
Cost:
$2,400
- - $15,194 1,448 - - - - - - -
-
kWh
$15,194
1,448
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$868
Cost:
$500
$532 10,844 $336 32 - - - - - - $532
10,844
kWh
$336
32
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$671
Cost:
$600
$524 10,551 $147 14 - - - - - - $524
10,551
kWh
$147
14
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$515
Cost:
$300
$421 8,499 $94 9 - - - - - - $421
8,499
kWh
$94
9
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$316
Cost:
$674
$147 2,931 $169 16 - - - - - - $147
2,931
kWh
$169
16
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$29,507
Cost:
$8,500
- - - - - - $(-393) - $29,900 - -
-
kWh
-
-
kW-months/year
-
-
lb
$(-393)
-
$
$29,900
-
$
07: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$600
Cost:
$100
- - - - $600 84,000 - - - - -
-
kWh
-
-
kW-months/year
$600
84,000
lb
-
-
$
-
-
$
08: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$47,448
Cost:
$21,500
$12,024 242,966 - - - - $35,424 - - - $12,024
242,966
kWh
-
-
kW-months/year
-
-
lb
$35,424
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$95,119
Cost:
$34,574
$13,648 275,791 $15,940 1,519 $600 84,000 $35,031 - $29,900 - $13,648
275,791
kWh
$15,940
1,519
kW-months/year
$600
84,000
lb
$35,031
-
$
$29,900
-
$
TOTAL IMPLEMENTED Savings:
$95,119
Cost:
$34,574
$13,648 275,791 $15,940 1,519 $600 84,000 $35,031 - $29,900 - $13,648
275,791
kWh
$15,940
1,519
kW-months/year
$600
84,000
lb
$35,031
-
$
$29,900
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes