IAC Assessment: BD0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product Fabricated Metal
NAICS n/a
SIC 3341 - Secondary Nonferrous Metals
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 130,000
Annual Production 180,000 Pieces
Production Hrs. Annual 7,072
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,639 2,092,614 kWh $0.05
Electricity Demand $11,392 4,831 kW-months/year $2.36
Electricity Fees $5,830 - $ -
Natural Gas $53,745 11,404 MMBtu $4.71
TOTAL ENERGY COSTS $205,148
RECOMMENDED SAVINGS* $272,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$14,857
Cost:
$7,000
- - - - $14,857 3,198 - - - - - - -
-
kWh
-
-
kW-months/year
$14,857
3,198
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$3,383
Cost:
-
$3,121 65,651 $262 111 - - - - - - - - $3,121
65,651
kWh
$262
111
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,941
Cost:
$3,160
$1,826 38,394 $115 49 - - - - - - - - $1,826
38,394
kWh
$115
49
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,022
Cost:
$800
$938 19,637 $84 36 - - - - - - - - $938
19,637
kWh
$84
36
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$967
Cost:
$650
$881 18,464 $86 37 - - - - - - - - $881
18,464
kWh
$86
37
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$85,424
Cost:
$67,500
- - - - - - - - - - $85,424 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$85,424
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$10,330
Cost:
$210
- - - - - - - - $10,330 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$10,330
-
$
-
-
$
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$154,560
Cost:
$23,000
- - - - - - $154,560 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$154,560
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$272,484
Cost:
$102,320
$6,766 142,146 $547 233 $14,857 3,198 $154,560 - $10,330 - $85,424 - $6,766
142,146
kWh
$547
233
kW-months/year
$14,857
3,198
MMBtu
$154,560
-
$
$10,330
-
$
$85,424
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost