IAC logo
IAC Assessment: BD0110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product Plastic Moldings
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 106
Plant Area (Sq.Ft.) 68,400
Annual Production 16,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,900 3,910,317 kWh $0.04
Electricity Demand $100,651 8,261 kW-months/year $12.18
Electricity Fees $3,160 - $ -
Natural Gas $11,480 2,108 MMBtu $5.45
TOTAL ENERGY COSTS $290,191
RECOMMENDED SAVINGS* $34,419 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,439
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,658
Cost:
$3,870
$1,552 35,170 $685 56 - - $421 - $1,552
35,170
kWh
$685
56
kW-months/year
-
-
MMBtu
$421
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,694
Cost:
$900
$1,891 42,790 $803 66 - - - - $1,891
42,790
kWh
$803
66
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$2,600
Cost:
$450
- - - - $2,600 628 - - -
-
kWh
-
-
kW-months/year
$2,600
628
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,729
Cost:
$3,200
$967 29,894 $585 58 - - $177 - $967
29,894
kWh
$585
58
kW-months/year
-
-
MMBtu
$177
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$920
Cost:
$200
$639 14,361 $281 23 - - - - $639
14,361
kWh
$281
23
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$686
Cost:
$850
$419 9,379 $267 22 - - - - $419
9,379
kWh
$267
22
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$374
Cost:
$335
$162 3,810 $61 5 - - $151 - $162
3,810
kWh
$61
5
kW-months/year
-
-
MMBtu
$151
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,269
Cost:
$7,000
- - - - - - $4,269 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,269
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,024
Cost:
$500
- - - - - - $3,024 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,024
-
$
10: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$15,465
Cost:
$1,500
$4,298 97,011 $2,167 178 - - $9,000 - $4,298
97,011
kWh
$2,167
178
kW-months/year
-
-
MMBtu
$9,000
-
$
TOTAL RECOMMENDED Savings:
$34,419
Cost:
$18,805
$9,928 232,415 $4,849 408 $2,600 628 $17,042 - $9,928
232,415
kWh
$4,849
408
kW-months/year
$2,600
628
MMBtu
$17,042
-
$
TOTAL IMPLEMENTED Savings:
$18,439
Cost:
$2,285
$4,460 100,821 $2,228 183 $2,600 628 $9,151 - $4,460
100,821
kWh
$2,228
183
kW-months/year
$2,600
628
MMBtu
$9,151
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes