IAC Assessment: BD0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product Ductile Iron Castings
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 40,400
Annual Production 1,200 Tons
Production Hrs. Annual 4,498
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,686 4,477,140 kWh $0.03
Electricity Demand $104,604 19,745 kW-months/year $5.30
Electricity Fees $7,790 - $ -
Natural Gas $64,933 14,356 MMBtu $4.52
TOTAL ENERGY COSTS $305,088
RECOMMENDED SAVINGS* $52,250 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,061
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$11,925
Cost:
$16,000
$515 18,757 $81 17 $11,329 2,503 - - - - $515
18,757
kWh
$81
17
kW-months/year
$11,329
2,503
MMBtu
-
-
lb
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,030
Cost:
$1,000
- - - - $8,030 1,774 - - - - -
-
kWh
-
-
kW-months/year
$8,030
1,774
MMBtu
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,993
Cost:
$4,850
$1,451 51,290 $542 102 - - - - - - $1,451
51,290
kWh
$542
102
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,196
Cost:
$500
$920 32,532 $276 52 - - - - - - $920
32,532
kWh
$276
52
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$638
Cost:
$550
$463 16,413 $175 33 - - - - - - $463
16,413
kWh
$175
33
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$309
Cost:
$294
$225 7,913 $84 16 - - - - - - $225
7,913
kWh
$84
16
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 3.5222 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) Savings:
$22,180
Cost:
$14,000
- - - - - - $22,180 800,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$22,180
800,000
lb
-
-
$
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,494
Cost:
$240
- - - - - - $1,494 32,500 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,494
32,500
lb
-
-
$
09: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$3,335
Cost:
$1,200
- - - - - - - - $3,335 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$3,335
-
$
10: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$1,150
Cost:
$400
- - - - - - - - $1,150 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,150
-
$
TOTAL RECOMMENDED Savings:
$52,250
Cost:
$39,034
$3,574 126,905 $1,158 220 $19,359 4,277 $23,674 832,500 $4,485 - $3,574
126,905
kWh
$1,158
220
kW-months/year
$19,359
4,277
MMBtu
$23,674
832,500
lb
$4,485
-
$
TOTAL IMPLEMENTED Savings:
$16,061
Cost:
$22,194
$3,574 126,905 $1,158 220 $11,329 2,503 - - - - $3,574
126,905
kWh
$1,158
220
kW-months/year
$11,329
2,503
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes