IAC Assessment: BD0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1998
Principal Product Machined Parts
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 36,000
Annual Production 2,000 Tons
Production Hrs. Annual 4,160
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,771 605,217 kWh $0.06
Electricity Demand $5,890 2,501 kW-months/year $2.36
Electricity Fees $305 - $ -
Natural Gas $9,890 2,114 MMBtu $4.68
TOTAL ENERGY COSTS $55,431
RECOMMENDED SAVINGS* $29,166 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,605
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,996
Cost:
$900
$3,633 57,737 $1,363 166 - - - - - - $3,633
57,737
kWh
$1,363
166
kW-months/year
-
-
Tgal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,869
Cost:
$4,085
$1,851 31,946 $708 86 - - - - $310 - $1,851
31,946
kWh
$708
86
kW-months/year
-
-
Tgal
-
-
$
$310
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,025
Cost:
-
$1,503 21,981 $522 64 - - - - - - $1,503
21,981
kWh
$522
64
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$647
Cost:
$250
$481 7,034 $166 20 - - - - - - $481
7,034
kWh
$166
20
kW-months/year
-
-
Tgal
-
-
$
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$641
Cost:
$300
$476 7,034 $165 20 - - - - - - $476
7,034
kWh
$165
20
kW-months/year
-
-
Tgal
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$459
Cost:
$225
$306 5,569 $153 19 - - - - - - $306
5,569
kWh
$153
19
kW-months/year
-
-
Tgal
-
-
$
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$319
Cost:
$625
- - - - $319 68,250 - - - - -
-
kWh
-
-
kW-months/year
$319
68,250
Tgal
-
-
$
-
-
$
08: 4.423 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$11,232
Cost:
$6,000
- - - - - - $11,232 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$11,232
-
$
-
-
$
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$5,715
Cost:
$2,500
- - - - - - $5,715 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$5,715
-
$
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$263
Cost:
-
- - - - - - $263 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$263
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,166
Cost:
$14,885
$8,250 131,301 $3,077 375 $319 68,250 $17,210 - $310 - $8,250
131,301
kWh
$3,077
375
kW-months/year
$319
68,250
Tgal
$17,210
-
$
$310
-
$
TOTAL IMPLEMENTED Savings:
$15,605
Cost:
$7,485
$6,987 111,664 $2,593 316 - - $5,715 - $310 - $6,987
111,664
kWh
$2,593
316
kW-months/year
-
-
Tgal
$5,715
-
$
$310
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes Administrative Changes