IAC logo
IAC Assessment: BD0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1999
Principal Product Molded Plastic Gears
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 34
Plant Area (Sq.Ft.) 17,761
Annual Production 80,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,423 2,030,774 kWh $0.04
Electricity Demand $52,644 4,296 kW-months/year $12.25
Electricity Fees $578 - $ -
Natural Gas $3,882 744 MMBtu $5.22
TOTAL ENERGY COSTS $141,783
RECOMMENDED SAVINGS* $40,228 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,892
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,753
Cost:
$800
$1,218 31,946 $535 44 - - - - $1,218
31,946
kWh
$535
44
kW-months/year
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,108
Cost:
-
$770 20,223 $338 28 - - - - $770
20,223
kWh
$338
28
kW-months/year
-
-
lb
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$876
Cost:
$525
$552 14,361 $324 26 - - - - $552
14,361
kWh
$324
26
kW-months/year
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$308
Cost:
$566
$142 3,810 $166 14 - - - - $142
3,810
kWh
$166
14
kW-months/year
-
-
lb
-
-
$
05: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$291
Cost:
$500
$202 5,275 $89 7 - - - - $202
5,275
kWh
$89
7
kW-months/year
-
-
lb
-
-
$
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$20,292
Cost:
$1,500
- - - - $20,292 171,950 - - -
-
kWh
-
-
kW-months/year
$20,292
171,950
lb
-
-
$
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$15,600
Cost:
$61,950
- - - - - - $15,600 - -
-
kWh
-
-
kW-months/year
-
-
lb
$15,600
-
$
TOTAL RECOMMENDED Savings:
$40,228
Cost:
$65,841
$2,884 75,615 $1,452 119 $20,292 171,950 $15,600 - $2,884
75,615
kWh
$1,452
119
kW-months/year
$20,292
171,950
lb
$15,600
-
$
TOTAL IMPLEMENTED Savings:
$17,892
Cost:
$63,041
$1,464 38,394 $828 68 - - $15,600 - $1,464
38,394
kWh
$828
68
kW-months/year
-
-
lb
$15,600
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes