Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1999
Principal Product Pallet Racking
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 425
Plant Area (Sq.Ft.) 410,000
Annual Production 70,000 Tons
Production Hrs. Annual 8,112
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $484,812 12,685,815 kWh $0.04
Electricity Demand $352,886 25,121 kW-months/year $14.05
Electricity Fees $3,789 - $ -
Natural Gas $554,035 194,467 MMBtu $2.85
TOTAL ENERGY COSTS $1,616,771
RECOMMENDED SAVINGS* $1,409,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $428,525
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$109,239
Cost:
$255,000
$806 21,395 $334 26 $108,099 37,148 - - - - - - - - - - $806
21,395
kWh
$334
26
kW-months/year
$108,099
37,148
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$15,134
Cost:
$17,430
$10,746 281,360 $4,388 312 - - - - - - - - - - - - $10,746
281,360
kWh
$4,388
312
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,301
Cost:
$500
$7,967 214,537 $4,334 309 - - - - - - - - - - - - $7,967
214,537
kWh
$4,334
309
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,606
Cost:
$5,600
- - - - $9,606 3,301 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$9,606
3,301
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,577
Cost:
$2,736
- - - - $5,577 1,950 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$5,577
1,950
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,041
Cost:
$840
$1,450 38,101 $591 42 - - - - - - - - - - - - $1,450
38,101
kWh
$591
42
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$855
Cost:
$525
$459 12,016 $396 28 - - - - - - - - - - - - $459
12,016
kWh
$396
28
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
08: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$837,135
Cost:
$1,600,000
- - - - - - - - $837,135 54,661 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$837,135
54,661
gal
-
-
$
-
-
$
-
-
$
09: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$30,353
Cost:
$10,000
- - - - - - $30,353 7,884,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$30,353
7,884,000
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
10: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$3,427
Cost:
$3,000
$(-827) (-21,688) $(-337) (-24) - - $4,591 1,192,464 - - - - - - - - $(-827)
(-21,688)
kWh
$(-337)
(-24)
kW-months/year
-
-
MMBtu
$4,591
1,192,464
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
11: 3.4151 MINIMIZE WATER USAGE Savings:
$1,471
Cost:
$2,590
- - - - - - $1,471 382,200 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,471
382,200
Tgal
-
-
gal
-
-
$
-
-
$
-
-
$
12: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$243,360
Cost:
$500,000
- - - - - - - - - - $243,360 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$243,360
-
$
-
-
$
-
-
$
13: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$107,799
Cost:
$26,500
$(-5,960) (-155,920) $(-3,241) (-231) - - - - - - - - - - $117,000 - $(-5,960)
(-155,920)
kWh
$(-3,241)
(-231)
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
$117,000
-
$
14: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$31,200
Cost:
$16,000
- - - - - - - - - - $15,600 - $15,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$15,600
-
$
$15,600
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,409,498
Cost:
$2,440,721
$14,641 389,801 $6,465 462 $123,282 42,399 $36,415 9,458,664 $837,135 54,661 $258,960 - $15,600 - $117,000 - $14,641
389,801
kWh
$6,465
462
kW-months/year
$123,282
42,399
MMBtu
$36,415
9,458,664
Tgal
$837,135
54,661
gal
$258,960
-
$
$15,600
-
$
$117,000
-
$
TOTAL IMPLEMENTED Savings:
$428,525
Cost:
$556,430
$3,457 96,718 $1,684 120 - - $31,824 8,266,200 - - $258,960 - $15,600 - $117,000 - $3,457
96,718
kWh
$1,684
120
kW-months/year
-
-
MMBtu
$31,824
8,266,200
Tgal
-
-
gal
$258,960
-
$
$15,600
-
$
$117,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost