IAC logo
IAC Assessment: BD0142
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0142
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1999
Principal Product Fabricated Rubber Products
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 32,000
Annual Production 700,000 Pounds
Production Hrs. Annual 4,290
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,641 646,249 kWh $0.06
Electricity Demand $8,133 3,456 kW-months/year $2.35
Electricity Fees $4,466 - $ -
Natural Gas $4,685 1,142 MMBtu $4.10
Other Gas $1,513 - MMBtu -
TOTAL ENERGY COSTS $66,496
RECOMMENDED SAVINGS* $30,543 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,305
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Water Disposal Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ Tgal $ gal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,333
Cost:
$2,050
$1,227 19,050 $106 45 - - - - - - $1,227
19,050
kWh
$106
45
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$325
Cost:
$675
$290 4,396 $35 15 - - - - - - $290
4,396
kWh
$35
15
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$141
Cost:
-
$128 2,052 $13 6 - - - - - - $128
2,052
kWh
$13
6
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$25,426
Cost:
$5,000
- - - - - - $25,426 102 - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$25,426
102
gal
-
-
$
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$1,238
Cost:
$3,500
- - - - $1,238 964,250 - - - - -
-
kWh
-
-
kW-months/year
$1,238
964,250
Tgal
-
-
gal
-
-
$
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$2,080
Cost:
$6,500
- - - - - - - - $2,080 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$2,080
-
$
TOTAL RECOMMENDED Savings:
$30,543
Cost:
$17,725
$1,645 25,498 $154 66 $1,238 964,250 $25,426 102 $2,080 - $1,645
25,498
kWh
$154
66
kW-months/year
$1,238
964,250
Tgal
$25,426
102
gal
$2,080
-
$
TOTAL IMPLEMENTED Savings:
$29,305
Cost:
$14,225
$1,645 25,498 $154 66 - - $25,426 102 $2,080 - $1,645
25,498
kWh
$154
66
kW-months/year
-
-
Tgal
$25,426
102
gal
$2,080
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ $