IAC Assessment: BD0151
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0151
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Industrial Marking Equipment & Inks
NAICS n/a
SIC 3953 - Marking Devices
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 110,000
Annual Production 25,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,252 813,599 kWh $0.06
Electricity Demand $39,411 3,363 kW-months/year $11.72
Electricity Fees $960 - $ -
Natural Gas $31,745 8,070 MMBtu $3.93
TOTAL ENERGY COSTS $126,406
RECOMMENDED SAVINGS* $20,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Increase in Production
$ kWh $ kW-months/year $ MMBtu $ gal $ %
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$6,104
Cost:
$20,000
- - - - $6,104 2,702 - - - - -
-
kWh
-
-
kW-months/year
$6,104
2,702
MMBtu
-
-
gal
-
-
%
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,699
Cost:
$3,075
$3,829 65,944 $1,870 160 - - - - - - $3,829
65,944
kWh
$1,870
160
kW-months/year
-
-
MMBtu
-
-
gal
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,828
Cost:
-
$1,432 24,619 $396 34 - - - - - - $1,432
24,619
kWh
$396
34
kW-months/year
-
-
MMBtu
-
-
gal
-
-
%
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,720
Cost:
$3,000
$1,360 23,447 $1,360 27 - - - - - - $1,360
23,447
kWh
$1,360
27
kW-months/year
-
-
MMBtu
-
-
gal
-
-
%
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$781
Cost:
$1,320
$604 10,551 $177 15 - - - - - - $604
10,551
kWh
$177
15
kW-months/year
-
-
MMBtu
-
-
gal
-
-
%
06: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$1,181
Cost:
$800
- - - - - - $1,181 2,376 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,181
2,376
gal
-
-
%
07: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$1,932
Cost:
$8,000
- - - - - - - - $1,932 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$1,932
-
%
TOTAL RECOMMENDED Savings:
$20,245
Cost:
$36,195
$7,225 124,561 $3,803 236 $6,104 2,702 $1,181 2,376 $1,932 - $7,225
124,561
kWh
$3,803
236
kW-months/year
$6,104
2,702
MMBtu
$1,181
2,376
gal
$1,932
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ %
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Increase in Production