Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2000 |
Principal Product | Insulated Containers |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 587,950 Pounds |
Production Hrs. Annual | 6,656 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $32,501 | 798,652 | kWh | $0.04 |
Electricity Demand | $30,134 | 2,411 | kW-months/year | $12.50 |
Electricity Fees | $1,860 | - | $ | - |
Natural Gas | $30,889 | 8,489 | MMBtu | $3.64 |
TOTAL ENERGY COSTS | $95,384 | |||
RECOMMENDED SAVINGS* | $22,711 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,892 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,239 Cost: $9,800 |
- | - | - | - | $3,239 | 990 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,239 990 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,396 Cost: $300 |
$898 | 21,981 | $498 | 40 | - | - | - | - | - | - | - | - |
$898 21,981 kWh |
$498 40 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,396 Cost: $800 |
$895 | 21,981 | $501 | 40 | - | - | - | - | - | - | - | - |
$895 21,981 kWh |
$501 40 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,094 Cost: $750 |
$513 | 12,603 | $581 | 47 | - | - | - | - | - | - | - | - |
$513 12,603 kWh |
$581 47 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,027 Cost: $200 |
$453 | 11,137 | $574 | 46 | - | - | - | - | - | - | - | - |
$453 11,137 kWh |
$574 46 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $743 Cost: - |
$478 | 11,723 | $265 | 21 | - | - | - | - | - | - | - | - |
$478 11,723 kWh |
$265 21 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $281 Cost: $270 |
$100 | 2,345 | $43 | 3 | - | - | - | - | $138 | - | - | - |
$100 2,345 kWh |
$43 3 kW-months/year |
- - MMBtu |
- - lb |
$138 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $6,572 Cost: $7,500 |
- | - | - | - | - | - | $6,572 | 142,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,572 142,000 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $6,300 Cost: $225 |
- | - | - | - | - | - | $6,300 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,300 - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $416 Cost: $225 |
- | - | - | - | - | - | - | - | - | - | $416 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$416 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $247 Cost: - |
- | - | - | - | - | - | - | - | $247 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$247 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $22,711 Cost: $20,070 |
$3,337 | 81,770 | $2,462 | 197 | $3,239 | 990 | $12,872 | 142,000 | $385 | - | $416 | - | $3,337 81,770 kWh |
$2,462 197 kW-months/year |
$3,239 990 MMBtu |
$12,872 142,000 lb |
$385 - $ |
$416 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,892 Cost: $8,870 |
$1,893 | 46,307 | $1,042 | 83 | - | - | $6,572 | 142,000 | $385 | - | - | - | $1,893 46,307 kWh |
$1,042 83 kW-months/year |
- - MMBtu |
$6,572 142,000 lb |
$385 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | By-product Production |