IAC Assessment: BD0173
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0173
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Municipal and Industrial Storage Tanks
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 108
Plant Area (Sq.Ft.) 480,000
Annual Production 500 Units
Production Hrs. Annual 4,200
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $447,233 9,075,029 kWh $0.05
Electricity Demand $202,602 24,817 kW-months/year $8.16
Electricity Fees $(-159) - $ -
Natural Gas $377,488 127,964 MMBtu $2.95
TOTAL ENERGY COSTS $1,055,443
RECOMMENDED SAVINGS* $441,363 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $392,698
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$31,116
Cost:
$16,000
- - - - $31,116 9,878 - - - - - - - - -
-
kWh
-
-
kW-months/year
$31,116
9,878
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,742
Cost:
$600
$7,263 138,042 $2,479 304 - - - - - - - - - - $7,263
138,042
kWh
$2,479
304
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,471
Cost:
$1,000
$5,569 105,803 $1,902 233 - - - - - - - - - - $5,569
105,803
kWh
$1,902
233
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,576
Cost:
$10,000
- - - - $2,576 818 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,576
818
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,220
Cost:
$1,050
$646 12,309 $574 70 - - - - - - - - - - $646
12,309
kWh
$574
70
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$805
Cost:
$660
$403 7,620 $86 11 - - - - - - $316 - - - $403
7,620
kWh
$86
11
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$316
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$664
Cost:
$750
- - - - $664 227 - - - - - - - - -
-
kWh
-
-
kW-months/year
$664
227
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
08: 3.4151 MINIMIZE WATER USAGE Savings:
$2,833
Cost:
$3,300
- - - - - - $2,833 1,904 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,833
1,904
Tgal
-
-
lb
-
-
$
-
-
$
09: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,980
Cost:
$500
- - - - - - - - $1,980 1,200 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,980
1,200
lb
-
-
$
-
-
$
10: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$382,956
Cost:
$150,000
- - - - - - - - - - - - $382,956 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$382,956
-
$
TOTAL RECOMMENDED Savings:
$441,363
Cost:
$183,860
$13,881 263,774 $5,041 618 $34,356 10,923 $2,833 1,904 $1,980 1,200 $316 - $382,956 - $13,881
263,774
kWh
$5,041
618
kW-months/year
$34,356
10,923
MMBtu
$2,833
1,904
Tgal
$1,980
1,200
lb
$316
-
$
$382,956
-
$
TOTAL IMPLEMENTED Savings:
$392,698
Cost:
$150,600
$7,263 138,042 $2,479 304 - - - - - - - - $382,956 - $7,263
138,042
kWh
$2,479
304
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$382,956
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product