IAC logo
IAC Assessment: BD0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2000
Principal Product Orthotics
NAICS n/a
SIC 3842 - Surgical Appliances And Supplies
Sales $10,000,000-$50,000,000
# of Employees 132
Plant Area (Sq.Ft.) 40,000
Annual Production 121,500 Units
Production Hrs. Annual 3,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,768 1,100,528 kWh $0.07
Electricity Demand $11,045 4,697 kW-months/year $2.35
Electricity Fees $190 - $ -
Natural Gas $6,006 1,173 MMBtu $5.12
TOTAL ENERGY COSTS $94,117
RECOMMENDED SAVINGS* $274,974 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $229,854
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product By-product Production Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product By-product Production Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ %
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$3,817
Cost:
$2,695
$3,369 49,531 $448 191 - - - - - - - - - - $3,369
49,531
kWh
$448
191
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,542
Cost:
$2,000
$2,542 37,222 - - - - - - - - - - - - $2,542
37,222
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,138
Cost:
$1,800
$1,824 26,964 $314 134 - - - - - - - - - - $1,824
26,964
kWh
$314
134
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$487
Cost:
$385
$294 4,396 $14 6 - - $179 - - - - - - - $294
4,396
kWh
$14
6
kW-months/year
-
-
lb
$179
-
$
-
-
$
-
-
$
-
-
%
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,090
Cost:
$400
- - - - $1,090 26,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,090
26,000
lb
-
-
$
-
-
$
-
-
$
-
-
%
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$854
Cost:
$250
- - - - $854 18,200 - - - - - - - - -
-
kWh
-
-
kW-months/year
$854
18,200
lb
-
-
$
-
-
$
-
-
$
-
-
%
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$526
Cost:
$500
- - - - - - - - $526 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$526
-
$
-
-
$
-
-
%
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$218,400
Cost:
$61,810
- - - - - - - - - - - - $218,400 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
$218,400
-
%
09: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$45,120
Cost:
$20,000
- - - - - - - - - - $45,120 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$45,120
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$274,974
Cost:
$89,840
$8,029 118,113 $776 331 $1,944 44,200 $179 - $526 - $45,120 - $218,400 - $8,029
118,113
kWh
$776
331
kW-months/year
$1,944
44,200
lb
$179
-
$
$526
-
$
$45,120
-
$
$218,400
-
%
TOTAL IMPLEMENTED Savings:
$229,854
Cost:
$69,840
$8,029 118,113 $776 331 $1,944 44,200 $179 - $526 - - - $218,400 - $8,029
118,113
kWh
$776
331
kW-months/year
$1,944
44,200
lb
$179
-
$
$526
-
$
-
-
$
$218,400
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product By-product Production Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) One-time Revenue or Avoided Cost Primary Product By-product Production Increase in Production