IAC Assessment: BD0181
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0181
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2001
Principal Product Printed Circuit Boards
NAICS n/a
SIC 3672 - Printed Circuit Boards
Sales $10,000,000-$50,000,000
# of Employees 106
Plant Area (Sq.Ft.) 67,000
Annual Production 40,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $281,246 6,725,616 kWh $0.04
Electricity Demand $151,545 12,397 kW-months/year $12.22
Electricity Fees $480 - $ -
Natural Gas $86,532 23,705 MMBtu $3.65
TOTAL ENERGY COSTS $690,656
RECOMMENDED SAVINGS* $55,329 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$12,426
Cost:
$17,500
$12,880 463,320 $6,553 535 $(-7,007) (-1,976) - - - - - - $12,880
463,320
kWh
$6,553
535
kW-months/year
$(-7,007)
(-1,976)
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$5,898
Cost:
$8,000
- - - - $5,898 1,663 - - - - - - -
-
kWh
-
-
kW-months/year
$5,898
1,663
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,193
Cost:
$600
$1,189 42,733 $1,004 82 - - - - - - - - $1,189
42,733
kWh
$1,004
82
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,608
Cost:
$1,000
$984 35,373 $624 51 - - - - - - - - $984
35,373
kWh
$624
51
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,047
Cost:
$2,060
$641 23,072 $406 33 - - - - - - - - $641
23,072
kWh
$406
33
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$908
Cost:
$675
$333 12,025 $575 47 - - - - - - - - $333
12,025
kWh
$575
47
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.1222 INSTALL TURBULATORS Savings:
$599
Cost:
$1,700
- - - - $599 169 - - - - - - -
-
kWh
-
-
kW-months/year
$599
169
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$25,872
Cost:
$12,000
- - - - - - $25,872 8,242,104 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,872
8,242,104
Tgal
-
-
$
-
-
$
09: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$4,700
Cost:
$2,500
- - - - - - - - $4,700 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$4,700
-
$
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$78
Cost:
-
- - - - - - - - - - $78 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$78
-
$
TOTAL RECOMMENDED Savings:
$55,329
Cost:
$46,035
$16,027 576,523 $9,162 748 $(-510) (-144) $25,872 8,242,104 $4,700 - $78 - $16,027
576,523
kWh
$9,162
748
kW-months/year
$(-510)
(-144)
MMBtu
$25,872
8,242,104
Tgal
$4,700
-
$
$78
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes One-time Revenue or Avoided Cost