Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2001 |
Principal Product | Metal Fabrications and Tube Bendings |
NAICS | n/a |
SIC | 3441 - Fabricated Structural Metal |
Sales | $1,000,000-$5,000,000 |
# of Employees | 53 |
Plant Area (Sq.Ft.) | 103,000 |
Annual Production | 440,576 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $97,816 | 1,372,032 | kWh | $0.07 |
Natural Gas | $57,603 | 8,358 | MMBtu | $6.89 |
TOTAL ENERGY COSTS | $191,808 | |||
RECOMMENDED SAVINGS* | $12,543 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $4,762 Cost: $8,000 |
$111 | 1,731 | $4,651 | 867 | - | - | - | - | - | - |
$111 1,731 kWh |
$4,651 867 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $924 Cost: $1,118 |
- | - | $924 | 137 | - | - | - | - | - | - |
- - kWh |
$924 137 MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $828 Cost: - |
$828 | 11,608 | - | - | - | - | - | - | - | - |
$828 11,608 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $454 Cost: $1,000 |
$454 | 6,379 | - | - | - | - | - | - | - | - |
$454 6,379 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $448 Cost: $1,125 |
$448 | 6,283 | - | - | - | - | - | - | - | - |
$448 6,283 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $205 Cost: $700 |
$205 | 2,864 | - | - | - | - | - | - | - | - |
$205 2,864 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $188 Cost: $480 |
$188 | 2,635 | - | - | - | - | - | - | - | - |
$188 2,635 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $4,364 Cost: $10,000 |
$675 | 9,461 | $1,709 | 254 | $3,796 | 1,123,200 | - | - | $(-1,816) | - |
$675 9,461 kWh |
$1,709 254 MMBtu |
$3,796 1,123,200 Tgal |
- - lb |
$(-1,816) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4151 MINIMIZE WATER USAGE |
Savings: $264 Cost: $690 |
- | - | - | - | $264 | 78,000 | - | - | - | - |
- - kWh |
- - MMBtu |
$264 78,000 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $106 Cost: $300 |
- | - | - | - | - | - | $106 | 3,400 | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$106 3,400 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,543 Cost: $23,413 |
$2,909 | 40,961 | $7,284 | 1,258 | $4,060 | 1,201,200 | $106 | 3,400 | $(-1,816) | - | $2,909 40,961 kWh |
$7,284 1,258 MMBtu |
$4,060 1,201,200 Tgal |
$106 3,400 lb |
$(-1,816) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | One-time Revenue or Avoided Cost |