IAC logo
IAC Assessment: BD0191
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0191
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2001
Principal Product Food Texturizing Ingredients
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $5,000,000-$10,000,000
# of Employees 21
Plant Area (Sq.Ft.) 32,411
Annual Production 3,500,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,025 1,286,400 kWh $0.04
Electricity Demand $29,845 3,206 kW-months/year $9.31
Electricity Fees $9,894 - $ -
Natural Gas $243,193 37,493 MMBtu $6.49
TOTAL ENERGY COSTS $369,195
RECOMMENDED SAVINGS* $40,025 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,419
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,978
Cost:
$9,500
$6,723 157,081 $2,255 242 - - - - - - - - $6,723
157,081
kWh
$2,255
242
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,215
Cost:
$4,660
$2,445 57,146 $770 83 - - - - - - - - $2,445
57,146
kWh
$770
83
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,185
Cost:
$400
$904 21,109 $281 30 - - - - - - - - $904
21,109
kWh
$281
30
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$1,021
Cost:
$1,040
$677 15,818 $283 30 - - - - - - $61 - $677
15,818
kWh
$283
30
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$61
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$995
Cost:
$175
$861 20,115 $134 14 - - - - - - - - $861
20,115
kWh
$134
14
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$599
Cost:
$1,050
$381 8,898 $218 23 - - - - - - - - $381
8,898
kWh
$218
23
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$559
Cost:
-
$394 9,215 $165 18 - - - - - - - - $394
9,215
kWh
$165
18
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$524
Cost:
$800
$403 9,405 $121 13 - - - - - - - - $403
9,405
kWh
$121
13
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$182
Cost:
$405
- - - - $182 33 - - - - - - -
-
kWh
-
-
kW-months/year
$182
33
MMBtu
-
-
Tgal
-
-
$
-
-
$
10: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$5,689
Cost:
$750
- - - - $3,240 514 $2,449 1,123,200 - - - - -
-
kWh
-
-
kW-months/year
$3,240
514
MMBtu
$2,449
1,123,200
Tgal
-
-
$
-
-
$
11: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$4,828
Cost:
$12,000
- - - - - - $4,828 2,670,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,828
2,670,000
Tgal
-
-
$
-
-
$
12: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$10,000
Cost:
$250
- - - - - - - - $10,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$10,000
-
$
-
-
$
13: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$2,250
Cost:
$400
- - - - - - - - - - $2,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$2,250
-
$
TOTAL RECOMMENDED Savings:
$40,025
Cost:
$31,430
$12,788 298,787 $4,227 453 $3,422 547 $7,277 3,793,200 $10,000 - $2,311 - $12,788
298,787
kWh
$4,227
453
kW-months/year
$3,422
547
MMBtu
$7,277
3,793,200
Tgal
$10,000
-
$
$2,311
-
$
TOTAL IMPLEMENTED Savings:
$12,419
Cost:
$7,015
$3,242 75,766 $1,056 114 $3,422 547 $2,449 1,123,200 - - $2,250 - $3,242
75,766
kWh
$1,056
114
kW-months/year
$3,422
547
MMBtu
$2,449
1,123,200
Tgal
-
-
$
$2,250
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost One-time Revenue or Avoided Cost