IAC logo
IAC Assessment: BD0197
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0197
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2001
Principal Product Electro-Mechanical Devices
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 60,000
Annual Production 10,000 Units
Production Hrs. Annual 2,080
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $16,828 370,394 kWh $0.05
Electricity Demand $13,389 1,132 kW-months/year $11.83
Electricity Fees $4,785 - $ -
Natural Gas $19,145 2,378 MMBtu $8.05
TOTAL ENERGY COSTS $61,988
RECOMMENDED SAVINGS* $7,439 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,554
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,885
Cost:
$3,000
- - - - $3,885 479 - - -
-
kWh
-
-
kW-months/year
$3,885
479
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,659
Cost:
$5,000
$655 14,724 $1,004 85 - - - - $655
14,724
kWh
$1,004
85
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,104
Cost:
$600
$434 9,802 $670 57 - - - - $434
9,802
kWh
$670
57
kW-months/year
-
-
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$229
Cost:
$157
$124 2,785 $105 9 - - - - $124
2,785
kWh
$105
9
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$144
Cost:
$450
$44 978 $100 9 - - - - $44
978
kWh
$100
9
kW-months/year
-
-
MMBtu
-
-
$
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$418
Cost:
-
- - - - - - $418 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$418
-
$
TOTAL RECOMMENDED Savings:
$7,439
Cost:
$9,207
$1,257 28,289 $1,879 160 $3,885 479 $418 - $1,257
28,289
kWh
$1,879
160
kW-months/year
$3,885
479
MMBtu
$418
-
$
TOTAL IMPLEMENTED Savings:
$3,554
Cost:
$6,207
$1,257 28,289 $1,879 160 - - $418 - $1,257
28,289
kWh
$1,879
160
kW-months/year
-
-
MMBtu
$418
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Product Electricity Usage Electricity Demand Natural Gas Primary Product