IAC Assessment: BD0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2002
Principal Product Concrete Ready Mix
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 225,000
Annual Production 20,000 Tons
Production Hrs. Annual 2,600
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,415 309,974 kWh $0.07
Electricity Demand $8,591 2,676 kW-months/year $3.21
Electricity Fees $3,732 - $ -
Natural Gas $48,876 5,630 MMBtu $8.68
TOTAL ENERGY COSTS $94,627
RECOMMENDED SAVINGS* $230,407 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,103
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$9,643
Cost:
$18,000
- - - - $9,643 1,180 - - - - - - -
-
kWh
-
-
kW-months/year
$9,643
1,180
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,679
Cost:
$800
$1,437 19,412 $242 82 - - - - - - - - $1,437
19,412
kWh
$242
82
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,227
Cost:
$4,330
$1,066 14,661 $161 51 - - - - - - - - $1,066
14,661
kWh
$161
51
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,217
Cost:
$1,125
$978 13,543 $239 74 - - - - - - - - $978
13,543
kWh
$239
74
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$609
Cost:
$2,000
- - - - $609 77 - - - - - - -
-
kWh
-
-
kW-months/year
$609
77
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$207
Cost:
$400
$173 2,365 $34 11 - - - - - - - - $173
2,365
kWh
$34
11
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$93
Cost:
$300
$84 1,072 $9 4 - - - - - - - - $84
1,072
kWh
$9
4
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 3.4151 MINIMIZE WATER USAGE Savings:
$329
Cost:
$690
- - - - - - $329 136,500 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$329
136,500
Tgal
-
-
$
-
-
$
09: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$204,000
Cost:
$50,000
- - - - - - - - - - $204,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$204,000
-
$
10: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$11,403
Cost:
$4,000
- - - - - - - - $11,403 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$11,403
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$230,407
Cost:
$81,645
$3,738 51,053 $685 222 $10,252 1,257 $329 136,500 $11,403 - $204,000 - $3,738
51,053
kWh
$685
222
kW-months/year
$10,252
1,257
MMBtu
$329
136,500
Tgal
$11,403
-
$
$204,000
-
$
TOTAL IMPLEMENTED Savings:
$3,103
Cost:
$2,325
$2,588 35,320 $515 167 - - - - - - - - $2,588
35,320
kWh
$515
167
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes One-time Revenue or Avoided Cost