Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2002
Principal Product High Pressure Hydraulic Hose Assemblies
NAICS n/a
SIC 3492 - Fluid Power Valves & Hose Fittings
Sales $10,000,000-$50,000,000
# of Employees 48
Plant Area (Sq.Ft.) 60,000
Annual Production 1,675,000 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,328 906,244 kWh $0.05
Electricity Demand $14,710 1,773 kW-months/year $8.30
Natural Gas $4,150 1,040 MMBtu $3.99
TOTAL ENERGY COSTS $62,962
RECOMMENDED SAVINGS* $173,722 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $704
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,063
Cost:
$1,050
$2,764 48,154 $299 83 - - - - - - $2,764
48,154
kWh
$299
83
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,724
Cost:
$2,550
$1,581 27,547 $143 40 - - - - - - $1,581
27,547
kWh
$143
40
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$977
Cost:
$600
$872 15,212 $105 29 - - - - - - $872
15,212
kWh
$105
29
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$704
Cost:
$2,700
- - - - $704 177 - - - - -
-
kWh
-
-
kW-months/year
$704
177
MMBtu
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$676
Cost:
-
$603 10,515 $73 20 - - - - - - $603
10,515
kWh
$73
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$540
Cost:
$750
- - - - - - - - $540 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$540
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$210
Cost:
$300
- - - - - - - - $210 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$210
-
$
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$165,828
Cost:
$350,000
- - - - - - $165,828 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$165,828
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$173,722
Cost:
$357,950
$5,820 101,428 $620 172 $704 177 $165,828 - $750 - $5,820
101,428
kWh
$620
172
kW-months/year
$704
177
MMBtu
$165,828
-
$
$750
-
$
TOTAL IMPLEMENTED Savings:
$704
Cost:
$2,700
- - - - $704 177 - - - - -
-
kWh
-
-
kW-months/year
$704
177
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost