IAC logo
IAC Assessment: BD0211
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2002
Principal Product Prototype Heavy Earthmoving Equipment
NAICS n/a
SIC 3531 - Construction Machinery
Sales $50,000,000-$100,000,000
# of Employees 260
Plant Area (Sq.Ft.) 170,000
Annual Production 200 Pieces
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,228 4,090,889 kWh $0.03
Electricity Demand $108,156 12,000 kW-months/year $9.01
Electricity Fees $2,390 - $ -
Natural Gas $148,420 21,931 MMBtu $6.77
TOTAL ENERGY COSTS $385,194
RECOMMENDED SAVINGS* $73,478 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,517
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$20,195
Cost:
$31,000
$557 18,845 $316 43 $19,322 2,804 - - - - $557
18,845
kWh
$316
43
kW-months/year
$19,322
2,804
MMBtu
-
-
$
-
-
$
02: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$7,722
Cost:
$5,000
- - - - $7,722 1,121 - - - - -
-
kWh
-
-
kW-months/year
$7,722
1,121
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,837
Cost:
$900
$879 28,458 $958 31,184 - - - - - - $879
28,458
kWh
$958
31,184
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,754
Cost:
$1,000
- - - - $1,754 255 - - - - -
-
kWh
-
-
kW-months/year
$1,754
255
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,288
Cost:
$900
$919 29,777 $369 41 - - - - - - $919
29,777
kWh
$369
41
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$302
Cost:
$1,000
$216 6,975 $86 10 - - - - - - $216
6,975
kWh
$86
10
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$197
Cost:
$274
$72 2,315 $29 3 - - $96 - - - $72
2,315
kWh
$29
3
kW-months/year
-
-
MMBtu
$96
-
$
-
-
$
08: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$32,683
Cost:
$40,000
- - - - $14,665 2,128 $18,018 - - - -
-
kWh
-
-
kW-months/year
$14,665
2,128
MMBtu
$18,018
-
$
-
-
$
09: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$7,500
Cost:
$1,000
- - - - - - - - $7,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$7,500
-
$
TOTAL RECOMMENDED Savings:
$73,478
Cost:
$81,074
$2,643 86,370 $1,758 31,281 $43,463 6,308 $18,114 - $7,500 - $2,643
86,370
kWh
$1,758
31,281
kW-months/year
$43,463
6,308
MMBtu
$18,114
-
$
$7,500
-
$
TOTAL IMPLEMENTED Savings:
$23,517
Cost:
$33,074
$2,427 79,395 $1,672 31,271 $19,322 2,804 $96 - - - $2,427
79,395
kWh
$1,672
31,271
kW-months/year
$19,322
2,804
MMBtu
$96
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Primary Product