IAC logo
IAC Assessment: BD0215
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0215
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2002
Principal Product Bicycle Helmets
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 285,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 3,744
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,150 2,863,680 kWh $0.08
Electricity Fees $2,796 - $ -
Natural Gas $113,904 15,297 MMBtu $7.45
TOTAL ENERGY COSTS $343,850
RECOMMENDED SAVINGS* $95,060 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,073
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ gal $ $ $ $ $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$20,511
Cost:
$4,000
$20,511 258,793 - - - - - - - - - - $20,511
258,793
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,289
Cost:
$1,500
- - $4,289 585 - - - - - - - - -
-
kWh
$4,289
585
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,792
Cost:
$12,000
$7,126 89,977 $(-3,334) (-515) - - - - - - - - $7,126
89,977
kWh
$(-3,334)
(-515)
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,820
Cost:
$1,875
$1,820 22,860 - - - - - - - - - - $1,820
22,860
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,290
Cost:
$1,000
$1,290 16,413 - - - - - - - - - - $1,290
16,413
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$779
Cost:
-
$779 9,965 - - - - - - - - - - $779
9,965
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$562
Cost:
$400
$562 7,034 - - - - - - - - - - $562
7,034
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$482
Cost:
$334
$317 4,103 - - - - - - - - $165 - $317
4,103
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$165
-
$
09: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$43,076
Cost:
$3,400
- - - - $43,076 10,769 - - - - - - -
-
kWh
-
-
MMBtu
$43,076
10,769
gal
-
-
$
-
-
$
-
-
$
10: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$17,159
Cost:
$18,000
- - - - - - $17,159 - - - - - -
-
kWh
-
-
MMBtu
-
-
gal
$17,159
-
$
-
-
$
-
-
$
11: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,300
Cost:
$102
- - - - - - - - $1,300 - - - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
$
$1,300
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$95,060
Cost:
$42,611
$32,405 409,145 $955 70 $43,076 10,769 $17,159 - $1,300 - $165 - $32,405
409,145
kWh
$955
70
MMBtu
$43,076
10,769
gal
$17,159
-
$
$1,300
-
$
$165
-
$
TOTAL IMPLEMENTED Savings:
$21,073
Cost:
$4,400
$21,073 265,827 - - - - - - - - - - $21,073
265,827
kWh
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Natural Gas Other Liquid (non-haz) Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost