Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2002 |
Principal Product | Aluminum Castings |
NAICS | n/a |
SIC | 3365 - Aluminum Foundries |
Sales | $1,000,000-$5,000,000 |
# of Employees | 20 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 1,050,000 Pounds |
Production Hrs. Annual | 2,600 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $98,852 | 1,311,840 | kWh | $0.08 |
Electricity Fees | $1,224 | - | $ | - |
Natural Gas | $30,239 | 40,986 | MMBtu | $0.74 |
TOTAL ENERGY COSTS | $136,154 | |||
RECOMMENDED SAVINGS* | $58,108 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,885 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Administrative Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $25,075 Cost: $56,000 |
$44,964 | 596,333 | $(-19,889) | (-2,696) | - | - | - | - |
$44,964 596,333 kWh |
$(-19,889) (-2,696) MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $16,340 Cost: $1,500 |
$16,340 | 216,692 | - | - | - | - | - | - |
$16,340 216,692 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,744 Cost: $1,500 |
- | - | $4,744 | 592 | - | - | - | - |
- - kWh |
$4,744 592 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $2,178 Cost: $3,000 |
- | - | $2,178 | 272 | - | - | - | - |
- - kWh |
$2,178 272 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,881 Cost: $3,000 |
$1,881 | 25,212 | - | - | - | - | - | - |
$1,881 25,212 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $555 Cost: - |
$555 | 7,356 | - | - | - | - | - | - |
$555 7,356 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $529 Cost: $900 |
$529 | 7,016 | - | - | - | - | - | - |
$529 7,016 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $365 Cost: $4,000 |
$365 | 4,841 | - | - | - | - | - | - |
$365 4,841 kWh |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.521 CLEAR AND RENT EXISTING SPACE |
Savings: $5,076 Cost: $1,000 |
- | - | - | - | $5,076 | - | - | - |
- - kWh |
- - MMBtu |
$5,076 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.447 AUTOMATE PAYROLL SYSTEM |
Savings: $1,365 Cost: $2,500 |
- | - | - | - | - | - | $1,365 | - |
- - kWh |
- - MMBtu |
- - $ |
$1,365 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $58,108 Cost: $73,400 |
$64,634 | 857,450 | $(-12,967) | (-1,832) | $5,076 | - | $1,365 | - | $64,634 857,450 kWh |
$(-12,967) (-1,832) MMBtu |
$5,076 - $ |
$1,365 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,885 Cost: $10,000 |
$19,141 | 254,101 | $4,744 | 592 | - | - | - | - | $19,141 254,101 kWh |
$4,744 592 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | Administrative Changes | One-time Revenue or Avoided Cost |