Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2004
Principal Product Stoneware Ceramics
NAICS 327110 - Pottery, Ceramics, and Plumbing Fixture Manufacturing
SIC 3269 - Pottery Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 60,000
Annual Production 1,462,000 Pieces
Production Hrs. Annual 2,080
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,875 881,400 kWh $0.05
Electricity Demand $35,183 3,693 kW-months/year $9.53
Natural Gas $144,878 21,280 MMBtu $6.81
TOTAL ENERGY COSTS $230,015
RECOMMENDED SAVINGS* $24,590 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,380
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,588
Cost:
$225
$2,152 44,284 $2,436 256 - - - - - - - - - - $2,152
44,284
kWh
$2,436
256
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$3,568
Cost:
$3,200
- - - - $3,568 656 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,568
656
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$2,822
Cost:
$1,400
- - - - $2,822 519 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,822
519
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
04: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$2,160
Cost:
$5,500
- - - - $2,160 398 - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,160
398
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,779
Cost:
$42
$763 15,702 $1,016 107 - - - - - - - - - - $763
15,702
kWh
$1,016
107
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,736
Cost:
-
$814 16,758 $922 97 - - - - - - - - - - $814
16,758
kWh
$922
97
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
07: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS Savings:
$1,363
Cost:
$340
$735 15,132 $628 66 - - - - - - - - - - $735
15,132
kWh
$628
66
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,601
Cost:
$731
$568 11,681 $642 67 - - - - - - $391 - - - $568
11,681
kWh
$642
67
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$391
-
$
-
-
$
09: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$1,243
Cost:
$2,000
$261 5,356 $982 103 - - - - - - - - - - $261
5,356
kWh
$982
103
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,157
Cost:
$1,200
$470 9,655 $687 72 - - - - - - - - - - $470
9,655
kWh
$687
72
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$680
Cost:
$500
$319 6,573 $361 38 - - - - - - - - - - $319
6,573
kWh
$361
38
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$373
Cost:
$368
$191 3,924 $51 5 - - - - - - $87 - $44 - $191
3,924
kWh
$51
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$87
-
$
$44
-
$
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$274
Cost:
$850
$274 5,636 - - - - - - - - - - - - $274
5,636
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
14: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$236
Cost:
$70
$121 2,477 $115 8 - - - - - - - - - - $121
2,477
kWh
$115
8
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
-
-
$
15: 3.4155 METER WASTE WATER Savings:
$587
Cost:
$165
- - - - - - - - $587 130,662 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$587
130,662
gal
-
-
$
-
-
$
16: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$423
Cost:
$746
- - - - - - $423 62,244 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$423
62,244
Tgal
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$24,590
Cost:
$17,337
$6,668 137,178 $7,840 819 $8,550 1,573 $423 62,244 $587 130,662 $478 - $44 - $6,668
137,178
kWh
$7,840
819
kW-months/year
$8,550
1,573
MMBtu
$423
62,244
Tgal
$587
130,662
gal
$478
-
$
$44
-
$
TOTAL IMPLEMENTED Savings:
$21,380
Cost:
$15,245
$5,161 106,185 $6,137 640 $8,550 1,573 $423 62,244 $587 130,662 $478 - $44 - $5,161
106,185
kWh
$6,137
640
kW-months/year
$8,550
1,573
MMBtu
$423
62,244
Tgal
$587
130,662
gal
$478
-
$
$44
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Ancillary Material Cost