Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2004 |
Principal Product | Stoneware Ceramics |
NAICS | 327110 - Pottery, Ceramics, and Plumbing Fixture Manufacturing |
SIC | 3269 - Pottery Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 1,462,000 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $42,875 | 881,400 | kWh | $0.05 |
Electricity Demand | $35,183 | 3,693 | kW-months/year | $9.53 |
Natural Gas | $144,878 | 21,280 | MMBtu | $6.81 |
TOTAL ENERGY COSTS | $230,015 | |||
RECOMMENDED SAVINGS* | $24,590 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,380 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,588 Cost: $225 |
$2,152 | 44,284 | $2,436 | 256 | - | - | - | - | - | - | - | - | - | - |
$2,152 44,284 kWh |
$2,436 256 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $3,568 Cost: $3,200 |
- | - | - | - | $3,568 | 656 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,568 656 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $2,822 Cost: $1,400 |
- | - | - | - | $2,822 | 519 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,822 519 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $2,160 Cost: $5,500 |
- | - | - | - | $2,160 | 398 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,160 398 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,779 Cost: $42 |
$763 | 15,702 | $1,016 | 107 | - | - | - | - | - | - | - | - | - | - |
$763 15,702 kWh |
$1,016 107 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,736 Cost: - |
$814 | 16,758 | $922 | 97 | - | - | - | - | - | - | - | - | - | - |
$814 16,758 kWh |
$922 97 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS |
Savings: $1,363 Cost: $340 |
$735 | 15,132 | $628 | 66 | - | - | - | - | - | - | - | - | - | - |
$735 15,132 kWh |
$628 66 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,601 Cost: $731 |
$568 | 11,681 | $642 | 67 | - | - | - | - | - | - | $391 | - | - | - |
$568 11,681 kWh |
$642 67 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$391 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $1,243 Cost: $2,000 |
$261 | 5,356 | $982 | 103 | - | - | - | - | - | - | - | - | - | - |
$261 5,356 kWh |
$982 103 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,157 Cost: $1,200 |
$470 | 9,655 | $687 | 72 | - | - | - | - | - | - | - | - | - | - |
$470 9,655 kWh |
$687 72 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $680 Cost: $500 |
$319 | 6,573 | $361 | 38 | - | - | - | - | - | - | - | - | - | - |
$319 6,573 kWh |
$361 38 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $373 Cost: $368 |
$191 | 3,924 | $51 | 5 | - | - | - | - | - | - | $87 | - | $44 | - |
$191 3,924 kWh |
$51 5 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$87 - $ |
$44 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $274 Cost: $850 |
$274 | 5,636 | - | - | - | - | - | - | - | - | - | - | - | - |
$274 5,636 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $236 Cost: $70 |
$121 | 2,477 | $115 | 8 | - | - | - | - | - | - | - | - | - | - |
$121 2,477 kWh |
$115 8 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 3.4155 METER WASTE WATER |
Savings: $587 Cost: $165 |
- | - | - | - | - | - | - | - | $587 | 130,662 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$587 130,662 gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $423 Cost: $746 |
- | - | - | - | - | - | $423 | 62,244 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$423 62,244 Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,590 Cost: $17,337 |
$6,668 | 137,178 | $7,840 | 819 | $8,550 | 1,573 | $423 | 62,244 | $587 | 130,662 | $478 | - | $44 | - | $6,668 137,178 kWh |
$7,840 819 kW-months/year |
$8,550 1,573 MMBtu |
$423 62,244 Tgal |
$587 130,662 gal |
$478 - $ |
$44 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,380 Cost: $15,245 |
$5,161 | 106,185 | $6,137 | 640 | $8,550 | 1,573 | $423 | 62,244 | $587 | 130,662 | $478 | - | $44 | - | $5,161 106,185 kWh |
$6,137 640 kW-months/year |
$8,550 1,573 MMBtu |
$423 62,244 Tgal |
$587 130,662 gal |
$478 - $ |
$44 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Ancillary Material Cost |