IAC logo
IAC Assessment: BD0276
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2005
Principal Product Ferrous metal parts
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $50,000,000-$100,000,000
# of Employees 125
Plant Area (Sq.Ft.) 207,900
Annual Production 50,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,673 2,224,909 kWh $0.06
Electricity Fees $25,041 - $ -
Natural Gas $133,516 18,128 MMBtu $7.37
TOTAL ENERGY COSTS $288,569
RECOMMENDED SAVINGS* $61,821 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,544
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Personnel Changes Electricity Usage Natural Gas Water Disposal Personnel Changes
$ kWh $ MMBtu $ Tgal $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$27,550
Cost:
$24,000
- - $27,550 4,028 - - - - -
-
kWh
$27,550
4,028
MMBtu
-
-
Tgal
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$14,544
Cost:
$48,000
- - $7,056 1,032 - - $7,488 - -
-
kWh
$7,056
1,032
MMBtu
-
-
Tgal
$7,488
-
$
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$8,381
Cost:
$2,000
- - $8,381 (-838) - - - - -
-
kWh
$8,381
(-838)
MMBtu
-
-
Tgal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,365
Cost:
$13,346
$4,365 77,392 - - - - - - $4,365
77,392
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,120
Cost:
$740
$2,120 38,812 - - - - - - $2,120
38,812
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,665
Cost:
$225
$1,665 29,338 - - - - - - $1,665
29,338
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.1222 INSTALL TURBULATORS Savings:
$1,362
Cost:
$2,150
- - $1,362 199 - - - - -
-
kWh
$1,362
199
MMBtu
-
-
Tgal
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$474
Cost:
$800
$474 8,394 - - - - - - $474
8,394
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
09: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,360
Cost:
$4,000
- - - - $1,360 1,216,800 - - -
-
kWh
-
-
MMBtu
$1,360
1,216,800
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$61,821
Cost:
$95,261
$8,624 153,936 $44,349 4,421 $1,360 1,216,800 $7,488 - $8,624
153,936
kWh
$44,349
4,421
MMBtu
$1,360
1,216,800
Tgal
$7,488
-
$
TOTAL IMPLEMENTED Savings:
$14,544
Cost:
$48,000
- - $7,056 1,032 - - $7,488 - -
-
kWh
$7,056
1,032
MMBtu
-
-
Tgal
$7,488
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Personnel Changes Electricity Usage Natural Gas Water Disposal Personnel Changes