IAC logo
IAC Assessment: BD0278
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0278
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2005
Principal Product Rolled Sheet Steel Strips
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $50,000,000-$100,000,000
# of Employees 25
Plant Area (Sq.Ft.) 76,400
Annual Production 20,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,465 1,251,508 kWh $0.06
Electricity Fees $13,967 - $ -
Natural Gas $28,700 4,830 MMBtu $5.94
TOTAL ENERGY COSTS $119,411
RECOMMENDED SAVINGS* $12,661 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,109
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,205
Cost:
$16,000
- - $4,205 807 - - -
-
kWh
$4,205
807
MMBtu
-
-
Tgal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,770
Cost:
$3,597
$3,770 66,960 - - - - $3,770
66,960
kWh
-
-
MMBtu
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,527
Cost:
$525
$1,527 27,110 - - - - $1,527
27,110
kWh
-
-
MMBtu
-
-
Tgal
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,148
Cost:
$2,000
$(-117) (-2,080) $1,265 243 - - $(-117)
(-2,080)
kWh
$1,265
243
MMBtu
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$552
Cost:
$450
$552 9,804 - - - - $552
9,804
kWh
-
-
MMBtu
-
-
Tgal
06: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,459
Cost:
$5,000
- - - - $1,459 1,497,600 -
-
kWh
-
-
MMBtu
$1,459
1,497,600
Tgal
TOTAL RECOMMENDED Savings:
$12,661
Cost:
$27,572
$5,732 101,794 $5,470 1,050 $1,459 1,497,600 $5,732
101,794
kWh
$5,470
1,050
MMBtu
$1,459
1,497,600
Tgal
TOTAL IMPLEMENTED Savings:
$12,109
Cost:
$27,122
$5,180 91,990 $5,470 1,050 $1,459 1,497,600 $5,180
91,990
kWh
$5,470
1,050
MMBtu
$1,459
1,497,600
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal