IAC Assessment: BD0287
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0287
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2005
Principal Product Greeting Card Display Fixtures
NAICS 337215 - Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 157
Plant Area (Sq.Ft.) 315,000
Annual Production 275,935 Pieces
Production Hrs. Annual 4,420
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $217,531 2,956,476 kWh $0.07
Electricity Demand $116,887 12,569 kW-months/year $9.30
Natural Gas $98,109 122,880 MMBtu $0.80
TOTAL ENERGY COSTS $440,765
RECOMMENDED SAVINGS* $49,248 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,894
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,639
Cost:
$248
$8,420 280,650 $5,219 561 - - - - $8,420
280,650
kWh
$5,219
561
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$12,300
Cost:
$8,850
$5,205 173,486 $7,095 763 - - - - $5,205
173,486
kWh
$7,095
763
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$9,255
Cost:
$19,600
- - - - $9,255 1,220 - - -
-
kWh
-
-
kW-months/year
$9,255
1,220
MMBtu
-
-
lb
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,137
Cost:
$1,500
$101 3,564 - - $4,036 544 - - $101
3,564
kWh
-
-
kW-months/year
$4,036
544
MMBtu
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,661
Cost:
$225
$235 7,823 $2,426 261 - - - - $235
7,823
kWh
$2,426
261
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,900
Cost:
$150
- - - - $1,900 238 - - -
-
kWh
-
-
kW-months/year
$1,900
238
MMBtu
-
-
lb
07: 2.1222 INSTALL TURBULATORS Savings:
$1,486
Cost:
$2,500
- - - - $1,486 196 - - -
-
kWh
-
-
kW-months/year
$1,486
196
MMBtu
-
-
lb
08: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$146
Cost:
-
$73 3,084 $73 107 - - - - $73
3,084
kWh
$73
107
kW-months/year
-
-
MMBtu
-
-
lb
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$894
Cost:
$2,500
$218 7,266 $676 73 - - - - $218
7,266
kWh
$676
73
kW-months/year
-
-
MMBtu
-
-
lb
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$658
Cost:
-
$367 12,220 $291 31 - - - - $367
12,220
kWh
$291
31
kW-months/year
-
-
MMBtu
-
-
lb
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$568
Cost:
$440
$168 5,586 $400 43 - - - - $168
5,586
kWh
$400
43
kW-months/year
-
-
MMBtu
-
-
lb
12: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$564
Cost:
$600
$314 10,474 $250 27 - - - - $314
10,474
kWh
$250
27
kW-months/year
-
-
MMBtu
-
-
lb
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,040
Cost:
$140
- - - - - - $1,040 1,040,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,040
1,040,000
lb
TOTAL RECOMMENDED Savings:
$49,248
Cost:
$36,753
$15,101 504,153 $16,430 1,866 $16,677 2,199 $1,040 1,040,000 $15,101
504,153
kWh
$16,430
1,866
kW-months/year
$16,677
2,199
MMBtu
$1,040
1,040,000
lb
TOTAL IMPLEMENTED Savings:
$34,894
Cost:
$24,963
$9,728 325,081 $8,935 1,060 $15,191 2,003 $1,040 1,040,000 $9,728
325,081
kWh
$8,935
1,060
kW-months/year
$15,191
2,003
MMBtu
$1,040
1,040,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)