IAC logo
IAC Assessment: BD0298
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0298
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2006
Principal Product Basement Windows
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $1,000,000-$5,000,000
# of Employees 18
Plant Area (Sq.Ft.) 32,000
Annual Production 94,000 Pieces
Production Hrs. Annual 2,210
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $11,570 266,388 kWh $0.04
Electricity Demand $5,538 2,556 kW-months/year $2.17
Electricity Fees $22,176 - $ -
Natural Gas $22,529 2,484 MMBtu $9.07
TOTAL ENERGY COSTS $61,813
RECOMMENDED SAVINGS* $4,523 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,419
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,476
Cost:
$1,014
- - - - $1,476 184 - - - - - - -
-
kWh
-
-
kW-months/year
$1,476
184
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$988
Cost:
$140
$825 19,014 $163 75 - - - - - - - - $825
19,014
kWh
$163
75
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$902
Cost:
-
- - - - - - - - $902 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$902
-
$
-
-
$
04: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$436
Cost:
$1,200
- - - - $436 54 - - - - - - -
-
kWh
-
-
kW-months/year
$436
54
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$350
Cost:
$350
$173 3,995 $12 6 - - $69 - - - $96 - $173
3,995
kWh
$12
6
kW-months/year
-
-
MMBtu
$69
-
$
-
-
$
$96
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$202
Cost:
$370
- - - - $202 25 - - - - - - -
-
kWh
-
-
kW-months/year
$202
25
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$169
Cost:
$300
$146 3,365 $23 10 - - - - - - - - $146
3,365
kWh
$23
10
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$4,523
Cost:
$3,374
$1,144 26,374 $198 91 $2,114 263 $69 - $902 - $96 - $1,144
26,374
kWh
$198
91
kW-months/year
$2,114
263
MMBtu
$69
-
$
$902
-
$
$96
-
$
TOTAL IMPLEMENTED Savings:
$3,419
Cost:
$3,004
$1,144 26,374 $198 91 $1,912 238 $69 - - - $96 - $1,144
26,374
kWh
$198
91
kW-months/year
$1,912
238
MMBtu
$69
-
$
-
-
$
$96
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost