Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2006
Principal Product Machine Parts and Metal Stamling
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 85,000
Annual Production 57,224,700 Pieces
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,802 1,428,360 kWh $0.05
Electricity Demand $8,563 4,094 kW-months/year $2.09
Natural Gas $16,789 1,572 MMBtu $10.68
TOTAL ENERGY COSTS $92,154
RECOMMENDED SAVINGS* $103,640 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $99,911
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$96,779
Cost:
$48,000
- - - - $6,299 860 $90,480 - -
-
kWh
-
-
kW-months/year
$6,299
860
MMBtu
$90,480
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,132
Cost:
$1,000
$2,884 61,624 $248 118 - - - - $2,884
61,624
kWh
$248
118
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,072
Cost:
$225
$1,917 40,960 $155 74 - - - - $1,917
40,960
kWh
$155
74
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$789
Cost:
$3,540
$648 13,847 $141 67 - - - - $648
13,847
kWh
$141
67
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$638
Cost:
-
$587 12,537 $51 24 - - - - $587
12,537
kWh
$51
24
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$230
Cost:
$300
$197 4,201 $33 16 - - - - $197
4,201
kWh
$33
16
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$103,640
Cost:
$53,065
$6,233 133,169 $628 299 $6,299 860 $90,480 - $6,233
133,169
kWh
$628
299
kW-months/year
$6,299
860
MMBtu
$90,480
-
$
TOTAL IMPLEMENTED Savings:
$99,911
Cost:
$49,000
$2,884 61,624 $248 118 $6,299 860 $90,480 - $2,884
61,624
kWh
$248
118
kW-months/year
$6,299
860
MMBtu
$90,480
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes