Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2006 |
Principal Product | Bumpers |
NAICS | 336211 - Motor Vehicle Body Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 118,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 4,368 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $165,750 | 3,028,624 | kWh | $0.05 |
Electricity Demand | $38,716 | 8,726 | kW-months/year | $4.44 |
Natural Gas | $134,569 | 15,236 | MMBtu | $8.83 |
TOTAL ENERGY COSTS | $339,035 | |||
RECOMMENDED SAVINGS* | $122,860 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,384 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $23,664 Cost: $27,472 |
- | - | - | - | $23,664 | 2,680 | - | - | - | - |
- - kWh |
- - kW-months/year |
$23,664 2,680 MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,400 Cost: $1,800 |
$6,539 | 152,787 | $1,861 | 419 | - | - | - | - | - | - |
$6,539 152,787 kWh |
$1,861 419 kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,190 Cost: - |
$1,705 | 39,754 | $485 | 109 | - | - | - | - | - | - |
$1,705 39,754 kWh |
$485 109 kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $809 Cost: $1,000 |
$631 | 14,704 | $178 | 40 | - | - | - | - | - | - |
$631 14,704 kWh |
$178 40 kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $7,023 Cost: $1,880 |
- | - | - | - | $7,023 | 758 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,023 758 MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $653 Cost: $1,200 |
$406 | 9,458 | $247 | 56 | - | - | - | - | - | - |
$406 9,458 kWh |
$247 56 kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $309 Cost: $475 |
$271 | 6,325 | $38 | 9 | - | - | - | - | - | - |
$271 6,325 kWh |
$38 9 kW-months/year |
- - MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $25,524 Cost: $60,000 |
- | - | - | - | - | - | - | - | $25,524 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$25,524 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $54,288 Cost: $17,200 |
- | - | - | - | - | - | $54,288 | 23,400 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$54,288 23,400 lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $122,860 Cost: $111,027 |
$9,552 | 223,028 | $2,809 | 633 | $30,687 | 3,438 | $54,288 | 23,400 | $25,524 | - | $9,552 223,028 kWh |
$2,809 633 kW-months/year |
$30,687 3,438 MMBtu |
$54,288 23,400 lb |
$25,524 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,384 Cost: $6,355 |
$9,552 | 223,028 | $2,809 | 633 | $7,023 | 758 | - | - | - | - | $9,552 223,028 kWh |
$2,809 633 kW-months/year |
$7,023 758 MMBtu |
- - lb |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Water Consumption |