IAC logo
IAC Assessment: BD0315
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0315
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2006
Principal Product Fabricated Tude products
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 120,000
Annual Production 0 Units
Production Hrs. Annual 2,080
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,039 1,470,760 kWh $0.07
Natural Gas $103,395 11,171 MMBtu $9.26
TOTAL ENERGY COSTS $213,302
RECOMMENDED SAVINGS* $54,127 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,751
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Other Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ MMBtu $ $ $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$12,408
Cost:
$12,368
- - $12,408 1,340 - - - - - - - - -
-
kWh
$12,408
1,340
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.5115 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE Savings:
$10,595
Cost:
$900
- - - - $10,595 1,187 - - - - - - -
-
kWh
-
-
MMBtu
$10,595
1,187
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$13,074
Cost:
$16,950
- - $13,074 704,436 - - - - - - - - -
-
kWh
$13,074
704,436
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,730
Cost:
$3,356
$1,730 25,594 - - - - - - - - - - $1,730
25,594
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,369
Cost:
$750
$1,329 19,647 - - - - $8 - - - $32 - $1,329
19,647
kWh
-
-
MMBtu
-
-
MMBtu
$8
-
$
-
-
$
$32
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,167
Cost:
$7,043
$1,167 17,264 - - - - - - - - - - $1,167
17,264
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$382
Cost:
$379
$293 4,327 - - - - $37 - - - $52 - $293
4,327
kWh
-
-
MMBtu
-
-
MMBtu
$37
-
$
-
-
$
$52
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,246
Cost:
$2,000
$1,246 18,435 - - - - - - - - - - $1,246
18,435
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,038
Cost:
-
$1,038 15,361 - - - - - - - - - - $1,038
15,361
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$588
Cost:
$1,050
$588 8,695 - - - - - - - - - - $588
8,695
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
-
-
$
-
-
$
11: 4.4470 AUTOMATE PAYROLL SYSTEM Savings:
$10,530
Cost:
$7,000
- - - - - - - - $10,530 - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
$10,530
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$54,127
Cost:
$51,796
$7,391 109,323 $25,482 705,776 $10,595 1,187 $45 - $10,530 - $84 - $7,391
109,323
kWh
$25,482
705,776
MMBtu
$10,595
1,187
MMBtu
$45
-
$
$10,530
-
$
$84
-
$
TOTAL IMPLEMENTED Savings:
$1,751
Cost:
$1,129
$1,622 23,974 - - - - $45 - - - $84 - $1,622
23,974
kWh
-
-
MMBtu
-
-
MMBtu
$45
-
$
-
-
$
$84
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $ $ $ $ $
Electricity Usage Natural Gas Other Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Other Gas Personnel Changes Administrative Changes Ancillary Material Cost