IAC Assessment: BD0316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2006
Principal Product Dasani, Powerade, HiC
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales n/a
# of Employees 125
Plant Area (Sq.Ft.) 210,000
Annual Production 9,854,741 Pieces
Production Hrs. Annual 6,260
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $454,260 7,435,313 kWh $0.06
Electricity Demand $49,830 24,088 kW-months/year $2.07
Electricity Fees $60,893 - $ -
Natural Gas $671,787 59,245 MMBtu $11.34
TOTAL ENERGY COSTS $1,608,510
RECOMMENDED SAVINGS* $27,460 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,589
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$7,871
Cost:
$800
$7,093 497 $778 376 $7,093
497
kWh
$778
376
kW-months/year
02: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$4,724
Cost:
$1,200
$4,256 298 $468 226 $4,256
298
kWh
$468
226
kW-months/year
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$13,153
Cost:
$8,363
$12,429 871 $724 350 $12,429
871
kWh
$724
350
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,033
Cost:
$675
$950 67 $83 40 $950
67
kWh
$83
40
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$679
Cost:
$2,102
$642 45 $37 18 $642
45
kWh
$37
18
kW-months/year
TOTAL RECOMMENDED Savings:
$27,460
Cost:
$13,140
$25,370 1,778 $2,090 1,010 $25,370
1,778
kWh
$2,090
1,010
kW-months/year
TOTAL IMPLEMENTED Savings:
$19,589
Cost:
$12,340
$18,277 1,281 $1,312 634 $18,277
1,281
kWh
$1,312
634
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand