IAC logo
IAC Assessment: BD0323
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0323
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2007
Principal Product Specialty Papter
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $5,000,000-$10,000,000
# of Employees 37
Plant Area (Sq.Ft.) 200,000
Annual Production 8,600 Tons
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $284,261 8,303,675 kWh $0.03
Electricity Demand $198,752 21,828 kW-months/year $9.11
Natural Gas $592,098 77,088 MMBtu $7.68
TOTAL ENERGY COSTS $1,075,111
RECOMMENDED SAVINGS* $42,922 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,302
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,169
Cost:
$20,500
$3,738 130,677 $1,431 157 - - - - - - $3,738
130,677
kWh
$1,431
157
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$171
Cost:
$150
$101 3,544 $70 8 - - - - - - $101
3,544
kWh
$70
8
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: -.---- Savings:
$372
Cost:
$400
$85 2,953 $249 24 - - $25 - $13 - $85
2,953
kWh
$249
24
kW-months/year
-
-
MMBtu
$25
-
$
$13
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$168
Cost:
$225
$57 1,997 $25 3 - - $51 - $35 - $57
1,997
kWh
$25
3
kW-months/year
-
-
MMBtu
$51
-
$
$35
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$613
Cost:
$185
$157 5,503 $96 11 - - $238 - $122 - $157
5,503
kWh
$96
11
kW-months/year
-
-
MMBtu
$238
-
$
$122
-
$
06: -.---- Savings:
$745
Cost:
$300
$462 16,146 $283 31 - - - - - - $462
16,146
kWh
$283
31
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: -.---- Savings:
$966
Cost:
$300
$599 20,948 $367 40 - - - - - - $599
20,948
kWh
$367
40
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.1222 INSTALL TURBULATORS Savings:
$1,467
Cost:
$1,200
- - - - $1,467 1,792 - - - - -
-
kWh
-
-
kW-months/year
$1,467
1,792
MMBtu
-
-
$
-
-
$
09: -.---- Savings:
$33,251
Cost:
$24,000
$900 6,983 $1,200 302 $31,151 4,020 - - - - $900
6,983
kWh
$1,200
302
kW-months/year
$31,151
4,020
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$42,922
Cost:
$47,260
$6,099 188,751 $3,721 576 $32,618 5,812 $314 - $170 - $6,099
188,751
kWh
$3,721
576
kW-months/year
$32,618
5,812
MMBtu
$314
-
$
$170
-
$
TOTAL IMPLEMENTED Savings:
$40,302
Cost:
$45,250
$5,800 178,298 $3,351 538 $31,151 4,020 - - - - $5,800
178,298
kWh
$3,351
538
kW-months/year
$31,151
4,020
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost