IAC logo
IAC Assessment: BD0328
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0328
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2007
Principal Product Newsprint
NAICS 424110 - Printing and Writing Paper Merchant Wholesalers
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 217
Plant Area (Sq.Ft.) 70,000
Annual Production 5,000 Tons
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $160,386 3,169,510 kWh $0.05
Natural Gas $12,785 1,845 MMBtu $6.93
TOTAL ENERGY COSTS $173,171
RECOMMENDED SAVINGS* $20,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,486
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$7,446
Cost:
$2,400
$7,446 878 - - - - - - $7,446
878
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,262
Cost:
$14,000
$612 72 - - - - $3,650 - $612
72
kWh
-
-
kW-months/year
-
-
Tgal
$3,650
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,823
Cost:
$90
$878 47 $1 43 - - $944 - $878
47
kWh
$1
43
kW-months/year
-
-
Tgal
$944
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,358
Cost:
$2,109
$1,357 91 $1 37 - - - - $1,357
91
kWh
$1
37
kW-months/year
-
-
Tgal
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,328
Cost:
$150
$1,328 78 - - - - - - $1,328
78
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$498
Cost:
$585
$354 23 - - - - $144 - $354
23
kWh
-
-
kW-months/year
-
-
Tgal
$144
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,183
Cost:
$2,730
$1,183 79 - - - - - - $1,183
79
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,128
Cost:
$500
$1,127 66 $1 31 - - - - $1,127
66
kWh
$1
31
kW-months/year
-
-
Tgal
-
-
$
09: 3.4151 MINIMIZE WATER USAGE Savings:
$1,171
Cost:
$4,000
- - - - $1,171 219,000 - - -
-
kWh
-
-
kW-months/year
$1,171
219,000
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$20,197
Cost:
$26,564
$14,285 1,334 $3 111 $1,171 219,000 $4,738 - $14,285
1,334
kWh
$3
111
kW-months/year
$1,171
219,000
Tgal
$4,738
-
$
TOTAL IMPLEMENTED Savings:
$2,486
Cost:
$2,609
$2,484 157 $2 68 - - - - $2,484
157
kWh
$2
68
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Disposal One-time Revenue or Avoided Cost