IAC logo
IAC Assessment: BD0339
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0339
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2008
Principal Product Animal feeds
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 35,000
Annual Production 17,000 Tons
Production Hrs. Annual 3,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,052 616,483 kWh $0.10
Natural Gas $30,292 5,500 MMBtu $5.51
TOTAL ENERGY COSTS $90,344
RECOMMENDED SAVINGS* $19,340 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,965
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$83
Cost:
$35
$66 916 - - - - $8 - $9 - $66
916
kWh
-
-
kW-months/year
-
-
MMBtu
$8
-
$
$9
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$221
Cost:
$75
$220 3,120 $1 11 - - - - - - $220
3,120
kWh
$1
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$55
Cost:
$2
$54 774 $1 3 - - - - - - $54
774
kWh
$1
3
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$116
Cost:
$76
$115 1,635 $1 6 - - - - - - $115
1,635
kWh
$1
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$10,344
Cost:
$2,501
- - - - $10,344 1,959 - - - - -
-
kWh
-
-
kW-months/year
$10,344
1,959
MMBtu
-
-
$
-
-
$
06: 2.1222 INSTALL TURBULATORS Savings:
$755
Cost:
$781
- - - - $755 143 - - - - -
-
kWh
-
-
kW-months/year
$755
143
MMBtu
-
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,766
Cost:
$9,021
$7,765 110,300 $1 424 - - - - - - $7,765
110,300
kWh
$1
424
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$19,340
Cost:
$12,491
$8,220 116,745 $4 444 $11,099 2,102 $8 - $9 - $8,220
116,745
kWh
$4
444
kW-months/year
$11,099
2,102
MMBtu
$8
-
$
$9
-
$
TOTAL IMPLEMENTED Savings:
$7,965
Cost:
$9,132
$7,946 112,851 $2 430 - - $8 - $9 - $7,946
112,851
kWh
$2
430
kW-months/year
-
-
MMBtu
$8
-
$
$9
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material