Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2008 |
Principal Product | Water Service Valves |
NAICS | 332911 - Industrial Valve Manufacturing |
SIC | 3491 - Industrial Valves |
Sales | $100,000,000-$500,000,000 |
# of Employees | 620 |
Plant Area (Sq.Ft.) | 280,000 |
Annual Production | 4,123,981 Units |
Production Hrs. Annual | 6,864 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $466,012 | 9,061,462 | kWh | $0.05 |
Electricity Demand | $94,892 | 24,309 | kW-months/year | $3.90 |
Electricity Fees | $31,965 | - | $ | - |
Natural Gas | $322,255 | 35,847 | MMBtu | $8.99 |
TOTAL ENERGY COSTS | $915,124 | |||
RECOMMENDED SAVINGS* | $201,531 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $56,525 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,786 Cost: $1,962 |
$1,372 | 24,184 | $414 | 112 | - | - | - | - | - | - | - | - |
$1,372 24,184 kWh |
$414 112 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $4,263 Cost: $2,326 |
$3,504 | 61,802 | $759 | 205 | - | - | - | - | - | - | - | - |
$3,504 61,802 kWh |
$759 205 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $1,016 Cost: $501 |
$619 | 10,918 | $260 | 70 | - | - | - | - | $62 | - | $75 | - |
$619 10,918 kWh |
$260 70 kW-months/year |
- - MMBtu |
- - lb |
$62 - $ |
$75 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $4,172 Cost: $121 |
$3,063 | 54,028 | $924 | 250 | - | - | - | - | $37 | - | $148 | - |
$3,063 54,028 kWh |
$924 250 kW-months/year |
- - MMBtu |
- - lb |
$37 - $ |
$148 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $35,562 Cost: $901 |
$31,913 | 562,836 | $3,649 | 984 | - | - | - | - | - | - | - | - |
$31,913 562,836 kWh |
$3,649 984 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,952 Cost: $2 |
$7,214 | 127,230 | $1,738 | 445 | - | - | - | - | - | - | - | - |
$7,214 127,230 kWh |
$1,738 445 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,036 Cost: $1,501 |
$862 | 16,155 | $174 | 46 | - | - | - | - | - | - | - | - |
$862 16,155 kWh |
$174 46 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $79,942 Cost: $60,001 |
- | - | - | - | $79,942 | 9,999 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$79,942 9,999 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1224 REPLACE BOILER |
Savings: $49,861 Cost: $10,001 |
- | - | - | - | $49,861 | 6,237 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$49,861 6,237 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1224 REPLACE BOILER |
Savings: $6,664 Cost: $2,001 |
- | - | - | - | $6,664 | 884 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,664 884 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS |
Savings: $3,717 Cost: $1,001 |
- | - | - | - | - | - | $3,717 | 8,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,717 8,000 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $4,560 Cost: $601 |
- | - | - | - | - | - | $4,560 | 120,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,560 120,000 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $201,531 Cost: $80,919 |
$48,547 | 857,153 | $7,918 | 2,112 | $136,467 | 17,120 | $8,277 | 128,000 | $99 | - | $223 | - | $48,547 857,153 kWh |
$7,918 2,112 kW-months/year |
$136,467 17,120 MMBtu |
$8,277 128,000 lb |
$99 - $ |
$223 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $56,525 Cost: $12,002 |
- | - | - | - | $56,525 | 7,121 | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
$56,525 7,121 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Primary Raw Material |