IAC Assessment: BD0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2008
Principal Product Water Service Valves
NAICS 332911 - Industrial Valve Manufacturing
SIC 3491 - Industrial Valves
Sales $100,000,000-$500,000,000
# of Employees 620
Plant Area (Sq.Ft.) 280,000
Annual Production 4,123,981 Units
Production Hrs. Annual 6,864
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $466,012 9,061,462 kWh $0.05
Electricity Demand $94,892 24,309 kW-months/year $3.90
Electricity Fees $31,965 - $ -
Natural Gas $322,255 35,847 MMBtu $8.99
TOTAL ENERGY COSTS $915,124
RECOMMENDED SAVINGS* $201,531 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,525
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,786
Cost:
$1,962
$1,372 24,184 $414 112 - - - - - - - - $1,372
24,184
kWh
$414
112
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,263
Cost:
$2,326
$3,504 61,802 $759 205 - - - - - - - - $3,504
61,802
kWh
$759
205
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,016
Cost:
$501
$619 10,918 $260 70 - - - - $62 - $75 - $619
10,918
kWh
$260
70
kW-months/year
-
-
MMBtu
-
-
lb
$62
-
$
$75
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,172
Cost:
$121
$3,063 54,028 $924 250 - - - - $37 - $148 - $3,063
54,028
kWh
$924
250
kW-months/year
-
-
MMBtu
-
-
lb
$37
-
$
$148
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$35,562
Cost:
$901
$31,913 562,836 $3,649 984 - - - - - - - - $31,913
562,836
kWh
$3,649
984
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,952
Cost:
$2
$7,214 127,230 $1,738 445 - - - - - - - - $7,214
127,230
kWh
$1,738
445
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,036
Cost:
$1,501
$862 16,155 $174 46 - - - - - - - - $862
16,155
kWh
$174
46
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$79,942
Cost:
$60,001
- - - - $79,942 9,999 - - - - - - -
-
kWh
-
-
kW-months/year
$79,942
9,999
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.1224 REPLACE BOILER Savings:
$49,861
Cost:
$10,001
- - - - $49,861 6,237 - - - - - - -
-
kWh
-
-
kW-months/year
$49,861
6,237
MMBtu
-
-
lb
-
-
$
-
-
$
10: 2.1224 REPLACE BOILER Savings:
$6,664
Cost:
$2,001
- - - - $6,664 884 - - - - - - -
-
kWh
-
-
kW-months/year
$6,664
884
MMBtu
-
-
lb
-
-
$
-
-
$
11: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$3,717
Cost:
$1,001
- - - - - - $3,717 8,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,717
8,000
lb
-
-
$
-
-
$
12: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$4,560
Cost:
$601
- - - - - - $4,560 120,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,560
120,000
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$201,531
Cost:
$80,919
$48,547 857,153 $7,918 2,112 $136,467 17,120 $8,277 128,000 $99 - $223 - $48,547
857,153
kWh
$7,918
2,112
kW-months/year
$136,467
17,120
MMBtu
$8,277
128,000
lb
$99
-
$
$223
-
$
TOTAL IMPLEMENTED Savings:
$56,525
Cost:
$12,002
- - - - $56,525 7,121 - - - - - - -
-
kWh
-
-
kW-months/year
$56,525
7,121
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material