Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Bradley University |
---|---|
Assessment Year | 2008 |
Principal Product | EPDM Sheeting, Adhesive Accessories |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 261 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 250,000 Thousand Feet |
Production Hrs. Annual | 7,488 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,387,708 | 26,432,538 | kWh | $0.05 |
Electricity Demand | $80,246 | 56,352 | kW-months/year | $1.42 |
Natural Gas | $483,331 | 62,785 | MMBtu | $7.70 |
TOTAL ENERGY COSTS | $2,012,051 | |||
RECOMMENDED SAVINGS* | $603,663 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,788 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $8,788 Cost: $1,125 |
$8,391 | 159,831 | $397 | 280 | - | - | - | - |
$8,391 159,831 kWh |
$397 280 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $38,551 Cost: $96,150 |
$37,030 | 705,342 | $1,521 | 1,071 | - | - | - | - |
$37,030 705,342 kWh |
$1,521 1,071 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,618 Cost: - |
$3,452 | 65,760 | $166 | 117 | - | - | - | - |
$3,452 65,760 kWh |
$166 117 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1224 REPLACE BOILER |
Savings: $205,005 Cost: $110,000 |
- | - | - | - | $205,005 | 26,624 | - | - |
- - kWh |
- - kW-months/year |
$205,005 26,624 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $87,545 Cost: $10,000 |
- | - | - | - | $87,545 | 11,450 | - | - |
- - kWh |
- - kW-months/year |
$87,545 11,450 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1222 INSTALL TURBULATORS |
Savings: $131,143 Cost: $8,000 |
- | - | - | - | $131,143 | 17,036 | - | - |
- - kWh |
- - kW-months/year |
$131,143 17,036 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $128,022 Cost: $46,000 |
- | - | - | - | $128,022 | 16,626 | - | - |
- - kWh |
- - kW-months/year |
$128,022 16,626 MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4151 MINIMIZE WATER USAGE |
Savings: $991 Cost: $2,300 |
- | - | - | - | - | - | $991 | 204,400 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$991 204,400 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $603,663 Cost: $273,575 |
$48,873 | 930,933 | $2,084 | 1,468 | $551,715 | 71,736 | $991 | 204,400 | $48,873 930,933 kWh |
$2,084 1,468 kW-months/year |
$551,715 71,736 MMBtu |
$991 204,400 gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,788 Cost: $1,125 |
$8,391 | 159,831 | $397 | 280 | - | - | - | - | $8,391 159,831 kWh |
$397 280 kW-months/year |
- - MMBtu |
- - gal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) |