IAC Assessment: BD0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2009
Principal Product Machined Castings and Forgings
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 218,000
Annual Production 100,000 Units
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $222,353 2,709,793 kWh $0.08
Natural Gas $13,931 1,468 MMBtu $9.49
TOTAL ENERGY COSTS $241,048
RECOMMENDED SAVINGS* $61,901 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,891
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Primary Raw Material Electricity Usage Natural Gas Personnel Changes Primary Raw Material
$ kWh $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,898
Cost:
$14,153
$14,898 825 - - - - - - $14,898
825
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$562
Cost:
$1,500
$562 32 - - - - - - $562
32
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,571
Cost:
$329
$5,116 283 - - - - $455 - $5,116
283
kWh
-
-
MMBtu
-
-
$
$455
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,326
Cost:
$3,675
$5,326 295 - - - - - - $5,326
295
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,020
Cost:
$1,500
$3,020 167 - - - - - - $3,020
167
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,871
Cost:
-
$5,871 325 - - - - - - $5,871
325
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$26,653
Cost:
$48,000
- - $2,653 70 $24,000 - - - -
-
kWh
$2,653
70
MMBtu
$24,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$61,901
Cost:
$69,157
$34,793 1,927 $2,653 70 $24,000 - $455 - $34,793
1,927
kWh
$2,653
70
MMBtu
$24,000
-
$
$455
-
$
TOTAL IMPLEMENTED Savings:
$8,891
Cost:
$1,500
$8,891 492 - - - - - - $8,891
492
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Primary Raw Material Electricity Usage Natural Gas Personnel Changes Primary Raw Material