IAC logo
IAC Assessment: BD0358
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0358
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2009
Principal Product Die Cut Lidding
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671 - Paper Coated & Laminated, Packaging
Sales $50,000,000-$100,000,000
# of Employees 122
Plant Area (Sq.Ft.) 86,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 6,240
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $278,710 3,925,008 kWh $0.07
Electricity Demand $44,591 20,955 kW-months/year $2.13
Electricity Fees $14,663 - $ -
Natural Gas $199,101 16,847 MMBtu $11.82
TOTAL ENERGY COSTS $539,514
RECOMMENDED SAVINGS* $458,177 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $359,522
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,893
Cost:
$241
$3,871 51,868 $208 98 - - $513 - $301 - $3,871
51,868
kWh
$208
98
kW-months/year
-
-
MMBtu
$513
-
$
$301
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$565
Cost:
$491
$375 5,326 $16 7 - - $80 - $94 - $375
5,326
kWh
$16
7
kW-months/year
-
-
MMBtu
$80
-
$
$94
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$10,495
Cost:
$3,961
$8,359 118,565 $1,108 520 - - $514 - $514 - $8,359
118,565
kWh
$1,108
520
kW-months/year
-
-
MMBtu
$514
-
$
$514
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,911
Cost:
$2
$1,802 25,563 $109 49 - - - - - - $1,802
25,563
kWh
$109
49
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$24,734
Cost:
$501
- - - - $24,734 2,093 - - - - -
-
kWh
-
-
kW-months/year
$24,734
2,093
MMBtu
-
-
$
-
-
$
06: 2.1224 REPLACE BOILER Savings:
$9,256
Cost:
$601
- - - - $9,256 783 - - - - -
-
kWh
-
-
kW-months/year
$9,256
783
MMBtu
-
-
$
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$34,960
Cost:
$24,000
- - - - $6,772 573 $28,188 - - - -
-
kWh
-
-
kW-months/year
$6,772
573
MMBtu
$28,188
-
$
-
-
$
08: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$32,157
Cost:
$5,301
- - - - $32,157 2,725 - - - - -
-
kWh
-
-
kW-months/year
$32,157
2,725
MMBtu
-
-
$
-
-
$
09: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$339,206
Cost:
$5,001
- - - - - - $339,206 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$339,206
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$458,177
Cost:
$40,099
$14,407 201,322 $1,441 674 $72,919 6,174 $368,501 - $909 - $14,407
201,322
kWh
$1,441
674
kW-months/year
$72,919
6,174
MMBtu
$368,501
-
$
$909
-
$
TOTAL IMPLEMENTED Savings:
$359,522
Cost:
$10,054
$8,734 123,891 $1,124 527 $9,256 783 $339,800 - $608 - $8,734
123,891
kWh
$1,124
527
kW-months/year
$9,256
783
MMBtu
$339,800
-
$
$608
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material