IAC Assessment: BD0361
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0361
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2009
Principal Product Printed Paper Products
NAICS 323117 - Books Printing
SIC 2732 - Book Printing
Sales $10,000,000-$50,000,000
# of Employees 319
Plant Area (Sq.Ft.) 300,000
Annual Production 100,191,000 Pieces
Production Hrs. Annual 7,488
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $496,054 13,252,124 kWh $0.04
Electricity Demand $297,238 26,133 kW-months/year $11.37
Natural Gas $257,657 25,769 MMBtu $10.00
TOTAL ENERGY COSTS $1,091,822
RECOMMENDED SAVINGS* $69,613 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,905
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,093
Cost:
$2,775
$743 19,870 $350 31 - - - - - - $743
19,870
kWh
$350
31
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,724
Cost:
-
$1,820 48,657 $2,553 225 - - - - $351 - $1,820
48,657
kWh
$2,553
225
kW-months/year
-
-
$
-
-
MMBtu
$351
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,411
Cost:
-
$375 10,025 $1,036 91 - - - - - - $375
10,025
kWh
$1,036
91
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,086
Cost:
$2,000
$587 15,691 $499 45 - - - - - - $587
15,691
kWh
$499
45
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$31,812
Cost:
$45,980
$21,256 568,331 $10,556 928 - - - - - - $21,256
568,331
kWh
$10,556
928
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$3,152
Cost:
$2,750
- - - - - - $3,152 320 - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,152
320
MMBtu
-
-
$
07: 4.4540 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$26,335
Cost:
$18,750
- - - - $26,335 - - - - - -
-
kWh
-
-
kW-months/year
$26,335
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$69,613
Cost:
$72,255
$24,781 662,574 $14,994 1,320 $26,335 - $3,152 320 $351 - $24,781
662,574
kWh
$14,994
1,320
kW-months/year
$26,335
-
$
$3,152
320
MMBtu
$351
-
$
TOTAL IMPLEMENTED Savings:
$32,905
Cost:
$48,755
$21,999 588,201 $10,906 959 - - - - - - $21,999
588,201
kWh
$10,906
959
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Raw Material