IAC logo
IAC Assessment: BD0382
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0382
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2010
Principal Product Escalators
NAICS 333921 - Elevator and Moving Stairway Manufacturing
SIC 3534 - Elevators And Moving Stairways
Sales <$500,000
# of Employees 110
Plant Area (Sq.Ft.) 206,667
Annual Production 116 Pieces
Production Hrs. Annual 3,536
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $65,361 1,707,450 kWh $0.04
Electricity Demand $37,235 5,681 kW-months/year $6.55
Electricity Fees $(-962) - $ -
Natural Gas $97,660 13,764 MMBtu $7.10
TOTAL ENERGY COSTS $200,314
RECOMMENDED SAVINGS* $25,605 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,269
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,174
Cost:
$20,735
$10,544 275,313 $6,120 934 - - - - $468 - $42 - $10,544
275,313
kWh
$6,120
934
kW-months/year
-
-
MMBtu
-
-
lb
$468
-
$
$42
-
$
02: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$3,316
Cost:
$3,200
- - - - $3,316 474 - - - - - - -
-
kWh
-
-
kW-months/year
$3,316
474
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$2,368
Cost:
$2,000
$(-33) (-867) $(-39) (-6) $2,440 218 - - - - - - $(-33)
(-867)
kWh
$(-39)
(-6)
kW-months/year
$2,440
218
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$323
Cost:
$442
$166 4,327 $39 6 - - - - $62 - $56 - $166
4,327
kWh
$39
6
kW-months/year
-
-
MMBtu
-
-
lb
$62
-
$
$56
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$244
Cost:
$300
$134 3,497 $110 17 - - - - - - - - $134
3,497
kWh
$110
17
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,020
Cost:
$360
- - - - - - $1,020 18,750 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,020
18,750
lb
-
-
$
-
-
$
07: 4.213 PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING Savings:
$1,160
Cost:
$160
- - - - - - - - $1,160 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,160
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,605
Cost:
$27,197
$10,811 282,270 $6,230 951 $5,756 692 $1,020 18,750 $1,690 - $98 - $10,811
282,270
kWh
$6,230
951
kW-months/year
$5,756
692
MMBtu
$1,020
18,750
lb
$1,690
-
$
$98
-
$
TOTAL IMPLEMENTED Savings:
$21,269
Cost:
$23,637
$10,811 282,270 $6,230 951 $2,440 218 - - $1,690 - $98 - $10,811
282,270
kWh
$6,230
951
kW-months/year
$2,440
218
MMBtu
-
-
lb
$1,690
-
$
$98
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $