IAC Assessment: BD0389
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0389
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2011
Principal Product Machined parts
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 250,000
Annual Production 0 Units
Production Hrs. Annual 5,688
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $266,107 4,058,903 kWh $0.07
Electricity Demand $39,779 26,835 kW-months/year $1.48
Electricity Fees $16,951 - $ -
Natural Gas $118,452 15,346 MMBtu $7.72
TOTAL ENERGY COSTS $441,289
RECOMMENDED SAVINGS* $101,087 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,894
Cost:
$4,000
- - - - $4,894 634 - - - - -
-
kWh
-
-
kW-months/year
$4,894
634
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,353
Cost:
$7,540
$3,221 49,679 $132 90 - - - - - - $3,221
49,679
kWh
$132
90
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,183
Cost:
$900
$2,083 32,147 $100 68 - - - - - - $2,083
32,147
kWh
$100
68
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,941
Cost:
$1,300
$1,864 28,759 $77 52 - - - - - - $1,864
28,759
kWh
$77
52
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,546
Cost:
$2,400
- - - - $1,546 200 - - - - -
-
kWh
-
-
kW-months/year
$1,546
200
MMBtu
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$593
Cost:
$1,500
$555 8,572 $38 26 - - - - - - $555
8,572
kWh
$38
26
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$46,647
Cost:
$384
- - - - - - - - $46,647 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$46,647
-
$
08: 4.446 AUTOMATE FINISHING PROCESS Savings:
$39,930
Cost:
$50,000
- - - - - - $39,930 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$39,930
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$101,087
Cost:
$68,024
$7,723 119,157 $347 236 $6,440 834 $39,930 - $46,647 - $7,723
119,157
kWh
$347
236
kW-months/year
$6,440
834
MMBtu
$39,930
-
$
$46,647
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost