IAC logo
IAC Assessment: BD0390
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0390
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2011
Principal Product Automotive Seating
NAICS 336360 - Motor Vehicle Seating and Interior Trim Manufacturing
SIC 2531 - Public Building & Related Furniture
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 97,185
Annual Production 20,000 Pieces
Production Hrs. Annual 2,080
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,694 798,369 kWh $0.08
Electricity Demand $7,494 3,074 kW-months/year $2.44
Electricity Fees $11,494 - $ -
Natural Gas $17,425 2,890 MMBtu $6.03
TOTAL ENERGY COSTS $97,107
RECOMMENDED SAVINGS* $13,347 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,749
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,012
Cost:
$21,240
$6,760 88,947 $1,252 513 - - - - - - $6,760
88,947
kWh
$1,252
513
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.1222 INSTALL TURBULATORS Savings:
$2,436
Cost:
$2,500
- - - - $2,436 477 - - - - -
-
kWh
-
-
kW-months/year
$2,436
477
MMBtu
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,595
Cost:
$4,000
$(-122) (-1,600) - - $1,717 337 - - - - $(-122)
(-1,600)
kWh
-
-
kW-months/year
$1,717
337
MMBtu
-
-
$
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$453
Cost:
$300
$382 5,028 $71 29 - - - - - - $382
5,028
kWh
$71
29
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$272
Cost:
$500
$248 3,267 $24 10 - - - - - - $248
3,267
kWh
$24
10
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$434
Cost:
$237
$304 3,995 $13 6 - - $57 - $60 - $304
3,995
kWh
$13
6
kW-months/year
-
-
MMBtu
$57
-
$
$60
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$145
Cost:
$510
$118 1,560 $27 11 - - - - - - $118
1,560
kWh
$27
11
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$13,347
Cost:
$29,287
$7,690 101,197 $1,387 569 $4,153 814 $57 - $60 - $7,690
101,197
kWh
$1,387
569
kW-months/year
$4,153
814
MMBtu
$57
-
$
$60
-
$
TOTAL IMPLEMENTED Savings:
$12,749
Cost:
$28,477
$7,190 94,609 $1,289 529 $4,153 814 $57 - $60 - $7,190
94,609
kWh
$1,289
529
kW-months/year
$4,153
814
MMBtu
$57
-
$
$60
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost