IAC Assessment: BD0399
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0399
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2011
Principal Product Heavy-gauge metal tanks
NAICS 332420 - Metal Tank (Heavy Gauge) Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $500,000-$1,000,000
# of Employees 283
Plant Area (Sq.Ft.) 237,088
Annual Production 170,000 Pieces
Production Hrs. Annual 4,420
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $365,720 7,902,422 kWh $0.05
Electricity Demand $77,902 51,850 kW-months/year $1.50
Electricity Fees $51,250 - $ -
Natural Gas $324,242 59,322 MMBtu $5.47
TOTAL ENERGY COSTS $819,114
RECOMMENDED SAVINGS* $56,862 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,417
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,451
Cost:
$55,000
- - - - $8,451 1,552 - - - - -
-
kWh
-
-
kW-months/year
$8,451
1,552
MMBtu
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$18,396
Cost:
$2,000
$17,397 266,410 $999 666 - - - - - - $17,397
266,410
kWh
$999
666
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,514
Cost:
$31,299
$16,408 354,409 $1,092 728 - - $4 - $10 - $16,408
354,409
kWh
$1,092
728
kW-months/year
-
-
MMBtu
$4
-
$
$10
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,480
Cost:
$20
$5,958 128,159 $522 348 - - - - - - $5,958
128,159
kWh
$522
348
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,021
Cost:
$8,100
$5,757 124,349 $264 177 - - - - - - $5,757
124,349
kWh
$264
177
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$56,862
Cost:
$96,419
$45,520 873,327 $2,877 1,919 $8,451 1,552 $4 - $10 - $45,520
873,327
kWh
$2,877
1,919
kW-months/year
$8,451
1,552
MMBtu
$4
-
$
$10
-
$
TOTAL IMPLEMENTED Savings:
$24,417
Cost:
$10,100
$23,154 390,759 $1,263 843 - - - - - - $23,154
390,759
kWh
$1,263
843
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost